IAC Assessment: GT0338
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0338
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product CUSTOM DYEING & FINISH
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 75,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $360,764 8,080,012 kWh $0.04
Natural Gas $665,452 194,920 MMBtu $3.41
LPG $2,821 672 MMBtu $4.20
Fuel Oil #2 $5,380 1,224 MMBtu $4.40
Fuel Oil #6 $5,793 2,120 MMBtu $2.73
TOTAL ENERGY COSTS $1,040,210
RECOMMENDED SAVINGS* $74,650 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,680
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$30,000
Cost:
$6,670
- - $30,000 8,900 -
-
kWh
$30,000
8,900
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,600
Cost:
$500
- - $15,600 4,576 -
-
kWh
$15,600
4,576
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,620
Cost:
$17,560
$11,620 259,965 - - $11,620
259,965
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$420
Cost:
$1,030
$420 9,379 - - $420
9,379
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$800
Cost:
$1,320
- - $800 235 -
-
kWh
$800
235
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,280
Cost:
$4,075
- - $5,280 1,550 -
-
kWh
$5,280
1,550
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,930
Cost:
$8,220
- - $10,930 3,206 -
-
kWh
$10,930
3,206
MMBtu
TOTAL RECOMMENDED Savings:
$74,650
Cost:
$39,375
$12,040 269,344 $62,610 18,467 $12,040
269,344
kWh
$62,610
18,467
MMBtu
TOTAL IMPLEMENTED Savings:
$51,680
Cost:
$12,565
- - $51,680 15,261 -
-
kWh
$51,680
15,261
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas