IAC logo
IAC Assessment: GT0351
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0351
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product MOLDED POLYSTRENE PRODUCTS
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $500,000-$1,000,000
# of Employees 8
Plant Area (Sq.Ft.) 0
Annual Production 378,000 Pounds
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,841 344,959 kWh $0.10
Natural Gas $15,326 4,096 MMBtu $3.74
TOTAL ENERGY COSTS $48,167
RECOMMENDED SAVINGS* $4,179 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$600
Cost:
-
$600 6,448 - - - - $600
6,448
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$373
Cost:
$2,000
$373 3,810 - - - - $373
3,810
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36
Cost:
$25
$36 293 - - - - $36
293
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$920
Cost:
$540
- - $920 246 - - -
-
kWh
$920
246
MMBtu
-
-
$
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$1,560
Cost:
$4,190
- - $1,560 417 - - -
-
kWh
$1,560
417
MMBtu
-
-
$
06: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$690
Cost:
$300
$990 10,258 - - $(-300) - $990
10,258
kWh
-
-
MMBtu
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$4,179
Cost:
$7,055
$1,999 20,809 $2,480 663 $(-300) - $1,999
20,809
kWh
$2,480
663
MMBtu
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes