IAC logo
IAC Assessment: GT0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product AUTOMOTIVE ALTERNATORS
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $847,886 17,719,813 kWh $0.05
Natural Gas $97,547 21,630 MMBtu $4.51
TOTAL ENERGY COSTS $945,433
RECOMMENDED SAVINGS* $60,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$10,948
Cost:
$1,800
$10,948 502,052 $10,948
502,052
kWh
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$20,524
Cost:
$10,400
$20,524 - $20,524
-
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,340
Cost:
$5,950
$3,340 68,875 $3,340
68,875
kWh
04: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$25,532
Cost:
$80,640
$25,532 249,414 $25,532
249,414
kWh
TOTAL RECOMMENDED Savings:
$60,344
Cost:
$98,790
$60,344 820,341 $60,344
820,341
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage