IAC logo
IAC Assessment: GT0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product PARTICLE BOARD
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,166,911 27,288,101 kWh $0.04
Natural Gas $28,602 8,116 MMBtu $3.52
Fuel Oil #6 $19,111 7,600 MMBtu $2.51
Wood $69,831 139,664 MMBtu $0.50
TOTAL ENERGY COSTS $1,284,455
RECOMMENDED SAVINGS* $27,239 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,137
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$74
Cost:
$150
$74 1,758 - - - - $74
1,758
kWh
-
-
MMBtu
-
-
$
02: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,630
Cost:
-
$2,630 61,547 - - - - $2,630
61,547
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,433
Cost:
-
$5,433 126,319 - - - - $5,433
126,319
kWh
-
-
MMBtu
-
-
$
04: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT Savings:
$19,102
Cost:
$28,000
$27,040 755,862 $(-33,075) (-66,150) $25,137 - $27,040
755,862
kWh
$(-33,075)
(-66,150)
MMBtu
$25,137
-
$
TOTAL RECOMMENDED Savings:
$27,239
Cost:
$28,150
$35,177 945,486 $(-33,075) (-66,150) $25,137 - $35,177
945,486
kWh
$(-33,075)
(-66,150)
MMBtu
$25,137
-
$
TOTAL IMPLEMENTED Savings:
$8,137
Cost:
$150
$8,137 189,624 - - - - $8,137
189,624
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $