IAC logo
IAC Assessment: GT0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1989
Principal Product POULTRY
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $50,000,000-$100,000,000
# of Employees 575
Plant Area (Sq.Ft.) 0
Annual Production 68,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $638,137 12,383,939 kWh $0.05
Natural Gas $150,811 50,391 MMBtu $2.99
TOTAL ENERGY COSTS $788,948
RECOMMENDED SAVINGS* $100,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,750
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,040
Cost:
-
- - $1,940 650 $(-900) - -
-
kWh
$1,940
650
MMBtu
$(-900)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$604
Cost:
$2,400
$604 11,723 - - - - $604
11,723
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$534
Cost:
$1,020
- - $534 179 - - -
-
kWh
$534
179
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$423
Cost:
$210
- - $423 142 - - -
-
kWh
$423
142
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$219
Cost:
$350
$219 4,396 - - - - $219
4,396
kWh
-
-
MMBtu
-
-
$
06: 2.2624 USE COLD WASTE WATER TO COOL CHILLER FEED WATER Savings:
$14,480
Cost:
$16,950
$14,480 281,360 - - - - $14,480
281,360
kWh
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$68,230
Cost:
$29,500
- - $68,230 22,820 - - -
-
kWh
$68,230
22,820
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,700
Cost:
-
$14,700 285,463 - - - - $14,700
285,463
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$100,230
Cost:
$50,430
$30,003 582,942 $71,127 23,791 $(-900) - $30,003
582,942
kWh
$71,127
23,791
MMBtu
$(-900)
-
$
TOTAL IMPLEMENTED Savings:
$85,750
Cost:
$33,480
$15,523 301,582 $71,127 23,791 $(-900) - $15,523
301,582
kWh
$71,127
23,791
MMBtu
$(-900)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes