IAC Assessment: GT0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product STAINLESS STEEL WIRE
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 0
Annual Production 2,400,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,033 1,733,587 kWh $0.06
Natural Gas $65,646 12,575 MMBtu $5.22
TOTAL ENERGY COSTS $170,679
RECOMMENDED SAVINGS* $45,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,326
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,430
Cost:
-
$24,120 400,059 $(-8,690) (-1,665) - - $24,120
400,059
kWh
$(-8,690)
(-1,665)
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$439
Cost:
$140
$439 7,327 - - - - $439
7,327
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,377
Cost:
-
$1,465 24,326 - - $(-88) - $1,465
24,326
kWh
-
-
MMBtu
$(-88)
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$120
Cost:
$30
$120 2,052 - - - - $120
2,052
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$18,000
Cost:
$300
- - $18,000 3,450 - - -
-
kWh
$18,000
3,450
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$80
Cost:
$130
- - $80 14 - - -
-
kWh
$80
14
MMBtu
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$9,880
Cost:
$7,550
- - $9,880 1,893 - - -
-
kWh
$9,880
1,893
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,326
Cost:
$8,150
$26,144 433,764 $19,270 3,692 $(-88) - $26,144
433,764
kWh
$19,270
3,692
MMBtu
$(-88)
-
$
TOTAL IMPLEMENTED Savings:
$45,326
Cost:
$8,150
$26,144 433,764 $19,270 3,692 $(-88) - $26,144
433,764
kWh
$19,270
3,692
MMBtu
$(-88)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes