IAC Assessment: GT0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1994
Principal Product Frozen Foods
NAICS n/a
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 230,000
Annual Production 3,800,000 Pieces
Production Hrs. Annual 3,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $361,939 6,632,181 kWh $0.05
Natural Gas $76,288 16,790 MMBtu $4.54
TOTAL ENERGY COSTS $438,227
RECOMMENDED SAVINGS* $27,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,590
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,190
Cost:
$6,500
- - $2,190 482 -
-
kWh
$2,190
482
MMBtu
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,060
Cost:
$500
$3,060 149,472 - - $3,060
149,472
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$19,520
Cost:
$40,000
$19,520 1,260,258 - - $19,520
1,260,258
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$80
Cost:
$100
$80 1,465 - - $80
1,465
kWh
-
-
MMBtu
05: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$660
Cost:
$2,000
$660 12,016 - - $660
12,016
kWh
-
-
MMBtu
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$620
Cost:
$1,750
- - $620 82 -
-
kWh
$620
82
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$930
Cost:
$1,220
$930 16,999 - - $930
16,999
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,060
Cost:
$52,070
$24,250 1,440,210 $2,810 564 $24,250
1,440,210
kWh
$2,810
564
MMBtu
TOTAL IMPLEMENTED Savings:
$23,590
Cost:
$41,820
$23,590 1,428,194 - - $23,590
1,428,194
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas