IAC logo
IAC Assessment: GT0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1994
Principal Product Poultry
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $10,000,000-$50,000,000
# of Employees 386
Plant Area (Sq.Ft.) 50,000
Annual Production 11,160,000 Pieces
Production Hrs. Annual 2,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $524,520 6,926,436 kWh $0.08
Natural Gas $126,862 29,387 MMBtu $4.32
TOTAL ENERGY COSTS $651,382
RECOMMENDED SAVINGS* $68,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,370
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,540
Cost:
$15,210
$3,540 46,893 - - $3,540
46,893
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$730
Cost:
$920
$730 9,672 - - $730
9,672
kWh
-
-
MMBtu
03: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$2,500
Cost:
-
- - $2,500 588 -
-
kWh
$2,500
588
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,830
Cost:
$10,800
- - $4,830 1,119 -
-
kWh
$4,830
1,119
MMBtu
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$13,300
Cost:
$10,000
- - $13,300 3,080 -
-
kWh
$13,300
3,080
MMBtu
06: 2.2514 COVER OPEN TANKS Savings:
$1,200
Cost:
$2,500
- - $1,200 279 -
-
kWh
$1,200
279
MMBtu
07: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$42,800
Cost:
$45,000
$42,800 - - - $42,800
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$68,900
Cost:
$84,430
$47,070 56,565 $21,830 5,066 $47,070
56,565
kWh
$21,830
5,066
MMBtu
TOTAL IMPLEMENTED Savings:
$60,370
Cost:
$71,130
$47,070 56,565 $13,300 3,080 $47,070
56,565
kWh
$13,300
3,080
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas