IAC logo
IAC Assessment: GT0550
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0550
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Recycled Polyethylene Plastic Flakes
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales <$500,000
# of Employees 45
Plant Area (Sq.Ft.) 60,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 5,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,610 876,612 kWh $0.07
Natural Gas $16,818 2,802 MMBtu $6.00
TOTAL ENERGY COSTS $76,428
RECOMMENDED SAVINGS* $9,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,325
Cost:
$4,100
$2,325 34,291 - - $2,325
34,291
kWh
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$342
Cost:
$230
- - $342 57 -
-
kWh
$342
57
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$70
Cost:
$45
- - $70 12 -
-
kWh
$70
12
MMBtu
04: 2.1224 REPLACE BOILER Savings:
$3,542
Cost:
$7,100
- - $3,542 607 -
-
kWh
$3,542
607
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,288
Cost:
$6,243
$3,288 48,359 - - $3,288
48,359
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,567
Cost:
$17,718
$5,613 82,650 $3,954 676 $5,613
82,650
kWh
$3,954
676
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas