IAC logo
IAC Assessment: GT0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Kaolin
NAICS n/a
SIC 3295 - Minerals, Ground Or Treated
Sales $10,000,000-$50,000,000
# of Employees 416
Plant Area (Sq.Ft.) 500,000
Annual Production 400,000 Tons
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,293,519 66,398,887 kWh $0.03
Natural Gas $2,752,965 892,057 MMBtu $3.09
TOTAL ENERGY COSTS $7,946,484
RECOMMENDED SAVINGS* $1,136,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $520,980
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$473,300
Cost:
$1,050,000
- - - - - - $473,300 - -
-
kWh
-
-
MMBtu
-
-
lb
$473,300
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$166,370
Cost:
$235,000
- - $166,370 53,840 - - - - -
-
kWh
$166,370
53,840
MMBtu
-
-
lb
-
-
$
03: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$99,420
Cost:
-
- - $99,420 32,175 - - - - -
-
kWh
$99,420
32,175
MMBtu
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,950
Cost:
$4,550
$1,950 83,822 - - - - - - $1,950
83,822
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 3.3121 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS Savings:
$349,805
Cost:
$1,000,000
$90,430 1,793,669 - - $259,375 130 - - $90,430
1,793,669
kWh
-
-
MMBtu
$259,375
130
lb
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,730
Cost:
$201,600
$45,730 1,099,648 - - - - - - $45,730
1,099,648
kWh
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$1,136,575
Cost:
$2,491,150
$138,110 2,977,139 $265,790 86,015 $259,375 130 $473,300 - $138,110
2,977,139
kWh
$265,790
86,015
MMBtu
$259,375
130
lb
$473,300
-
$
TOTAL IMPLEMENTED Savings:
$520,980
Cost:
$1,256,150
$47,680 1,183,470 - - - - $473,300 - $47,680
1,183,470
kWh
-
-
MMBtu
-
-
lb
$473,300
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes