Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1995 |
Principal Product | Kaolin |
NAICS | n/a |
SIC | 3295 - Minerals, Ground Or Treated |
Sales | $10,000,000-$50,000,000 |
# of Employees | 416 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 400,000 Tons |
Production Hrs. Annual | 8,400 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,293,519 | 66,398,887 | kWh | $0.03 |
Natural Gas | $2,752,965 | 892,057 | MMBtu | $3.09 |
TOTAL ENERGY COSTS | $7,946,484 | |||
RECOMMENDED SAVINGS* | $1,136,575 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $520,980 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $473,300 Cost: $1,050,000 |
- | - | - | - | - | - | $473,300 | - |
- - kWh |
- - MMBtu |
- - lb |
$473,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $166,370 Cost: $235,000 |
- | - | $166,370 | 53,840 | - | - | - | - |
- - kWh |
$166,370 53,840 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS |
Savings: $99,420 Cost: - |
- | - | $99,420 | 32,175 | - | - | - | - |
- - kWh |
$99,420 32,175 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,950 Cost: $4,550 |
$1,950 | 83,822 | - | - | - | - | - | - |
$1,950 83,822 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3121 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS |
Savings: $349,805 Cost: $1,000,000 |
$90,430 | 1,793,669 | - | - | $259,375 | 130 | - | - |
$90,430 1,793,669 kWh |
- - MMBtu |
$259,375 130 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $45,730 Cost: $201,600 |
$45,730 | 1,099,648 | - | - | - | - | - | - |
$45,730 1,099,648 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,136,575 Cost: $2,491,150 |
$138,110 | 2,977,139 | $265,790 | 86,015 | $259,375 | 130 | $473,300 | - | $138,110 2,977,139 kWh |
$265,790 86,015 MMBtu |
$259,375 130 lb |
$473,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $520,980 Cost: $1,256,150 |
$47,680 | 1,183,470 | - | - | - | - | $473,300 | - | $47,680 1,183,470 kWh |
- - MMBtu |
- - lb |
$473,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes |