IAC logo
IAC Assessment: GT0579
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0579
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Latex Caulking
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 120,000
Annual Production 17,500,000 Pounds
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,065 1,990,914 kWh $0.02
Electricity Demand $79,016 5,185 kW-months/year $15.24
Electricity Fees $6,496 - $ -
Natural Gas $17,308 6,349 MMBtu $2.73
TOTAL ENERGY COSTS $158,263
RECOMMENDED SAVINGS* $12,316 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,620
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$784
Cost:
$3,892
$298 11,430 $486 32 - - - - - - $298
11,430
kWh
$486
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$681
Cost:
$550
$201 7,913 $480 32 - - - - - - $201
7,913
kWh
$480
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$844
Cost:
$200
$481 18,464 $363 26 - - - - - - $481
18,464
kWh
$363
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,141
Cost:
$230
$1,097 42,204 $2,044 136 - - - - - - $1,097
42,204
kWh
$2,044
136
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$835
Cost:
$1,260
$111 4,689 $724 48 - - - - - - $111
4,689
kWh
$724
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,940
Cost:
$9,180
- - - - $1,940 711 - - - - -
-
kWh
-
-
kW-months/year
$1,940
711
MMBtu
-
-
Tgal
-
-
Tgal
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,311
Cost:
$2,500
- - - - - - $1,340 542,700 $971 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,340
542,700
Tgal
$971
-
Tgal
08: 3.4155 METER WASTE WATER Savings:
$1,780
Cost:
-
- - - - - - $1,780 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,780
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$12,316
Cost:
$17,812
$2,188 84,700 $4,097 274 $1,940 711 $3,120 542,700 $971 - $2,188
84,700
kWh
$4,097
274
kW-months/year
$1,940
711
MMBtu
$3,120
542,700
Tgal
$971
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,620
Cost:
$7,142
$980 37,807 $1,329 90 - - $1,340 542,700 $971 - $980
37,807
kWh
$1,329
90
kW-months/year
-
-
MMBtu
$1,340
542,700
Tgal
$971
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption