IAC Assessment: GT0593
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0593
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Nylon Yarn
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $50,000,000-$100,000,000
# of Employees 650
Plant Area (Sq.Ft.) 318,740
Annual Production 60,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,277,028 50,475,382 kWh $0.03
Electricity Demand $947,485 88,799 kW-months/year $10.67
Electricity Fees $153,106 - $ -
Natural Gas $432,627 124,622 MMBtu $3.47
Fuel Oil #2 $78,545 18,182 MMBtu $4.32
TOTAL ENERGY COSTS $2,916,081
RECOMMENDED SAVINGS* $79,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,120
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$26,920
Cost:
$147,550
$16,640 657,679 $10,030 940 $250 - - - $16,640
657,679
kWh
$10,030
940
kW-months/year
$250
-
$
-
-
Tgal
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13,303
Cost:
$11,440
$8,297 327,960 $5,006 469 - - - - $8,297
327,960
kWh
$5,006
469
kW-months/year
-
-
$
-
-
Tgal
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,900
Cost:
-
$1,186 46,893 $674 67 $40 - - - $1,186
46,893
kWh
$674
67
kW-months/year
$40
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,670
Cost:
$1,000
$3,540 140,094 $2,130 200 - - - - $3,540
140,094
kWh
$2,130
200
kW-months/year
-
-
$
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,300
Cost:
$55,000
$28,300 1,119,285 - - - - - - $28,300
1,119,285
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
06: 3.4155 METER WASTE WATER Savings:
$3,630
Cost:
-
- - - - - - $3,630 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,630
-
Tgal
TOTAL RECOMMENDED Savings:
$79,723
Cost:
$214,990
$57,963 2,291,911 $17,840 1,676 $290 - $3,630 - $57,963
2,291,911
kWh
$17,840
1,676
kW-months/year
$290
-
$
$3,630
-
Tgal
TOTAL IMPLEMENTED Savings:
$38,120
Cost:
$148,550
$21,366 844,666 $12,834 1,207 $290 - $3,630 - $21,366
844,666
kWh
$12,834
1,207
kW-months/year
$290
-
$
$3,630
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal