IAC logo
IAC Assessment: GT0597
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0597
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Printed Wood Grain Paper
NAICS n/a
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 200,000
Annual Production 823,000 Thousand Feet
Production Hrs. Annual 8,424
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,592 10,674,385 kWh $0.02
Electricity Demand $303,875 25,344 kW-months/year $11.99
Electricity Fees $51,831 - $ -
Natural Gas $385,330 99,436 MMBtu $3.88
Fuel Oil #2 $39,702 8,350 MMBtu $4.75
TOTAL ENERGY COSTS $1,176,712
RECOMMENDED SAVINGS* $129,554 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$9,934
Cost:
$5,000
$9,520 337,046 - - $414 - - - - - - - $9,520
337,046
kWh
-
-
kW-months/year
$414
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$8,380
Cost:
$2,000
- - - - - - $8,380 2,165 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,380
2,165
MMBtu
-
-
Tgal
-
-
$
03: 3.4151 MINIMIZE WATER USAGE Savings:
$62,640
Cost:
-
- - - - - - - - $31,320 12,000,000 $31,320 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$31,320
12,000,000
Tgal
$31,320
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$9,570
Cost:
$75,450
$9,114 370,457 - - $456 - - - - - - - $9,114
370,457
kWh
-
-
kW-months/year
$456
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$29,270
Cost:
$96,000
$17,030 692,263 $10,846 904 $1,394 - - - - - - - $17,030
692,263
kWh
$10,846
904
kW-months/year
$1,394
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,760
Cost:
$48,450
$5,454 221,571 $3,844 321 $462 - - - - - - - $5,454
221,571
kWh
$3,844
321
kW-months/year
$462
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$129,554
Cost:
$226,900
$41,118 1,621,337 $14,690 1,225 $2,726 - $8,380 2,165 $31,320 12,000,000 $31,320 - $41,118
1,621,337
kWh
$14,690
1,225
kW-months/year
$2,726
-
$
$8,380
2,165
MMBtu
$31,320
12,000,000
Tgal
$31,320
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost