IAC Assessment: GT0599
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Displays and Signs
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $1,000,000-$5,000,000
# of Employees 175
Plant Area (Sq.Ft.) 115,700
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,550
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,654 2,337,925 kWh $0.07
Electricity Demand $36,514 10,708 kW-months/year $3.41
Electricity Fees $15,378 - $ -
Natural Gas $50,003 6,505 MMBtu $7.69
TOTAL ENERGY COSTS $274,069
RECOMMENDED SAVINGS* $57,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,219
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes
$ kWh $ kW-months/year $ $ $ Tgal $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,660
Cost:
$18,860
- - - - - - - - $5,660 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$5,660
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,459
Cost:
$2,640
$5,135 65,944 $1,929 360 $395 - - - - - $5,135
65,944
kWh
$1,929
360
kW-months/year
$395
-
$
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,100
Cost:
$600
$6,848 86,753 $1,718 321 $534 - - - - - $6,848
86,753
kWh
$1,718
321
kW-months/year
$534
-
$
-
-
Tgal
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$33,280
Cost:
$30,000
$22,736 287,808 $8,653 1,614 $1,891 - - - - - $22,736
287,808
kWh
$8,653
1,614
kW-months/year
$1,891
-
$
-
-
Tgal
-
-
$
05: 3.4155 METER WASTE WATER Savings:
$500
Cost:
$600
- - - - - - - - $500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$500
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$1,490
Cost:
$3,000
- - - - - - $1,490 331,500 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,490
331,500
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$57,489
Cost:
$55,700
$34,719 440,505 $12,300 2,295 $2,820 - $1,490 331,500 $6,160 - $34,719
440,505
kWh
$12,300
2,295
kW-months/year
$2,820
-
$
$1,490
331,500
Tgal
$6,160
-
$
TOTAL IMPLEMENTED Savings:
$22,219
Cost:
$22,100
$11,983 152,697 $3,647 681 $929 - - - $5,660 - $11,983
152,697
kWh
$3,647
681
kW-months/year
$929
-
$
-
-
Tgal
$5,660
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes