IAC logo
IAC Assessment: GT0602
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0602
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Landing Gears
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 80,000 Pieces
Production Hrs. Annual 4,500
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,656 2,892,145 kWh $0.07
Electricity Demand $7,119 3,738 kW-months/year $1.90
Electricity Fees $231 - $ -
Natural Gas $115,355 19,279 MMBtu $5.98
TOTAL ENERGY COSTS $321,161
RECOMMENDED SAVINGS* $70,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$41,960
Cost:
$76,100
- - - - - - - - - - $41,960 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$41,960
-
$
-
-
$
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,330
Cost:
$500
- - - - $1,330 306 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,330
306
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$690
Cost:
$300
$690 10,258 - - - - - - - - - - - - $690
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,980
Cost:
$1,000
$4,816 70,926 $164 63 - - - - - - - - - - $4,816
70,926
kWh
$164
63
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 3.2176 INCREASE USE OF AUTOMATION Savings:
$20,487
Cost:
$8,000
$437 6,448 $50 19 - - - - $20,000 - - - - - $437
6,448
kWh
$50
19
kW-months/year
-
-
MMBtu
-
-
Tgal
$20,000
-
$
-
-
$
-
-
$
06: 3.6114 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE Savings:
$1,044
Cost:
$3,500
- - - - - - $1,800 16,200 $(-270) - - - $(-486) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,800
16,200
Tgal
$(-270)
-
$
-
-
$
$(-486)
-
$
TOTAL RECOMMENDED Savings:
$70,491
Cost:
$89,400
$5,943 87,632 $214 82 $1,330 306 $1,800 16,200 $19,730 - $41,960 - $(-486) - $5,943
87,632
kWh
$214
82
kW-months/year
$1,330
306
MMBtu
$1,800
16,200
Tgal
$19,730
-
$
$41,960
-
$
$(-486)
-
$
TOTAL IMPLEMENTED Savings:
$5,670
Cost:
$1,300
$5,506 81,184 $164 63 - - - - - - - - - - $5,506
81,184
kWh
$164
63
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $