IAC Assessment: GT0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Fertilizer
NAICS n/a
SIC 2873 - Nitrogenous Fertilizers
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 150,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $232,566 4,560,082 kWh $0.05
Electricity Demand $34,174 9,113 kW-months/year $3.75
Electricity Fees $11,070 - $ -
Natural Gas $226,031 41,022 MMBtu $5.51
TOTAL ENERGY COSTS $729,872
RECOMMENDED SAVINGS* $153,059 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,589
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,090
Cost:
-
- - $1,204 321 $8,886 - - - - - - - - - -
-
kWh
$1,204
321
kW-months/year
$8,886
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$88,813
Cost:
$83,600
- - - - - - - - - - $(-800) - $89,613 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$(-800)
-
$
$89,613
-
$
03: 2.2521 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS Savings:
$9,060
Cost:
$1,000
- - - - - - $9,060 1,647 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,060
1,647
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$32,500
Cost:
$40,000
- - - - - - $32,500 10,161 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$32,500
10,161
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,035
Cost:
$450
- - - - - - $1,035 323 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,035
323
MMBtu
-
-
gal
-
-
$
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$7,420
Cost:
$10,000
- - - - - - $7,420 2,318 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,420
2,318
MMBtu
-
-
gal
-
-
$
-
-
$
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,067
Cost:
$350
$887 17,292 $180 48 - - - - - - - - - - $887
17,292
kWh
$180
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,074
Cost:
$10,500
$2,271 44,549 $225 60 - - - - $28 55 - - $550 - $2,271
44,549
kWh
$225
60
kW-months/year
-
-
$
-
-
MMBtu
$28
55
gal
-
-
$
$550
-
$
TOTAL RECOMMENDED Savings:
$153,059
Cost:
$145,900
$3,158 61,841 $1,609 429 $8,886 - $50,015 14,449 $28 55 $(-800) - $90,163 - $3,158
61,841
kWh
$1,609
429
kW-months/year
$8,886
-
$
$50,015
14,449
MMBtu
$28
55
gal
$(-800)
-
$
$90,163
-
$
TOTAL IMPLEMENTED Savings:
$20,589
Cost:
$21,950
$2,271 44,549 $225 60 - - $17,515 4,288 $28 55 - - $550 - $2,271
44,549
kWh
$225
60
kW-months/year
-
-
$
$17,515
4,288
MMBtu
$28
55
gal
-
-
$
$550
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost