IAC logo
IAC Assessment: GT0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Concrete Artifacts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 135
Plant Area (Sq.Ft.) 58,000
Annual Production 7,000,000 Units
Production Hrs. Annual 3,650
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,883 425,264 kWh $0.03
Electricity Demand $28,753 1,497 kW-months/year $19.21
Electricity Fees $1,585 - $ -
Natural Gas $46,403 7,331 MMBtu $6.33
TOTAL ENERGY COSTS $90,837
RECOMMENDED SAVINGS* $36,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.7314 REDUCE VENTILATION AIR Savings:
$6,440
Cost:
$7,500
- - - - - - $6,440 1,017 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,440
1,017
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$1,430
Cost:
$3,000
- - - - - - $1,430 226 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,430
226
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$2,710
Cost:
$1,500
- - - - - - $2,710 428 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,710
428
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,050
Cost:
$14,205
$1,653 64,478 $3,265 170 $132 - - - - - - - - - - - - - $1,653
64,478
kWh
$3,265
170
kW-months/year
$132
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$790
Cost:
$250
$196 7,620 $576 30 $18 - - - - - - - - - - - - - $196
7,620
kWh
$576
30
kW-months/year
$18
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$6,239
Cost:
$22,000
- - - - - - - - - - $63 4,700 - - - - $6,176 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$63
4,700
lb
-
-
$
-
-
$
$6,176
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,000
Cost:
-
- - - - - - - - - - - - - - $3,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$3,000
-
$
-
-
$
08: 4.2130 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING Savings:
$10,300
Cost:
$3,750
- - - - - - - - - - - - $10,300 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$10,300
-
$
-
-
$
-
-
$
09: 3.4155 METER WASTE WATER Savings:
$870
Cost:
$500
- - - - - - - - $870 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$870
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$36,829
Cost:
$52,705
$1,849 72,098 $3,841 200 $150 - $10,580 1,671 $870 - $63 4,700 $10,300 - $3,000 - $6,176 - $1,849
72,098
kWh
$3,841
200
kW-months/year
$150
-
$
$10,580
1,671
MMBtu
$870
-
Tgal
$63
4,700
lb
$10,300
-
$
$3,000
-
$
$6,176
-
$
TOTAL IMPLEMENTED Savings:
$21,110
Cost:
$13,500
$196 7,620 $576 30 $18 - $9,150 1,445 $870 - - - $10,300 - - - - - $196
7,620
kWh
$576
30
kW-months/year
$18
-
$
$9,150
1,445
MMBtu
$870
-
Tgal
-
-
lb
$10,300
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material