Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1997 |
Principal Product | Roofing Material |
NAICS | n/a |
SIC | 2952 - Asphalt Felts And Coatings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 162,000 |
Annual Production | 12,000,000 Thousand Gallons |
Production Hrs. Annual | 7,200 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $156,751 | 6,320,633 | kWh | $0.02 |
Electricity Demand | $113,478 | 12,348 | kW-months/year | $9.19 |
Electricity Fees | $20,873 | - | $ | - |
Natural Gas | $350,268 | 108,993 | MMBtu | $3.21 |
LPG | $33,920 | 3,666 | MMBtu | $9.25 |
Fuel Oil #2 | $34,313 | 5,324 | MMBtu | $6.44 |
TOTAL ENERGY COSTS | $878,803 | |||
RECOMMENDED SAVINGS* | $192,256 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,806 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $66,400 Cost: $60,620 |
- | - | $66,400 | 20,700 | - | - | - | - |
- - kWh |
$66,400 20,700 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $62,700 Cost: $18,000 |
- | - | $28,570 | 9,040 | $6,830 | 6,830,000 | $27,300 | - |
- - kWh |
$28,570 9,040 MMBtu |
$6,830 6,830,000 Tgal |
$27,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $990 Cost: $500 |
$990 | 39,566 | - | - | - | - | - | - |
$990 39,566 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $116 Cost: $310 |
- | - | $116 | 36 | - | - | - | - |
- - kWh |
$116 36 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,050 Cost: $700 |
$2,050 | 81,770 | - | - | - | - | - | - |
$2,050 81,770 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.7196 USE RE-USABLE FILTERS |
Savings: $60,000 Cost: $8,000 |
- | - | - | - | - | - | $60,000 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$60,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $192,256 Cost: $88,130 |
$3,040 | 121,336 | $95,086 | 29,776 | $6,830 | 6,830,000 | $87,300 | - | $3,040 121,336 kWh |
$95,086 29,776 MMBtu |
$6,830 6,830,000 Tgal |
$87,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,806 Cost: $18,810 |
$990 | 39,566 | $28,686 | 9,076 | $6,830 | 6,830,000 | $27,300 | - | $990 39,566 kWh |
$28,686 9,076 MMBtu |
$6,830 6,830,000 Tgal |
$27,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost |