IAC logo
IAC Assessment: GT0620
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0620
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Packaged Sausage
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 27,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,452 1,175,850 kWh $0.03
Electricity Demand $29,544 2,603 kW-months/year $11.35
Electricity Fees $3,046 - $ -
Natural Gas $27,533 4,648 MMBtu $5.92
TOTAL ENERGY COSTS $90,575
RECOMMENDED SAVINGS* $17,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,325
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,454
Cost:
$1,200
$855 33,118 $518 46 $81 - - - - - - - $855
33,118
kWh
$518
46
kW-months/year
$81
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,260
Cost:
$1,870
- - - - - - $1,260 213 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,260
213
MMBtu
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,270
Cost:
$6,830
$2,963 114,302 $2,002 176 $305 - - - - - - - $2,963
114,302
kWh
$2,002
176
kW-months/year
$305
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$390
Cost:
$900
$228 8,792 $136 12 $26 - - - - - - - $228
8,792
kWh
$136
12
kW-months/year
$26
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$55
Cost:
$50
- - - - - - $30 5 - - $25 - -
-
kWh
-
-
kW-months/year
-
-
$
$30
5
MMBtu
-
-
$
$25
-
Tgal
06: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$9,546
Cost:
$50,000
- - - - - - $1,954 330 $7,500 - $92 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,954
330
MMBtu
$7,500
-
$
$92
-
Tgal
TOTAL RECOMMENDED Savings:
$17,975
Cost:
$60,850
$4,046 156,212 $2,656 234 $412 - $3,244 548 $7,500 - $117 - $4,046
156,212
kWh
$2,656
234
kW-months/year
$412
-
$
$3,244
548
MMBtu
$7,500
-
$
$117
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,325
Cost:
$6,880
$2,963 114,302 $2,002 176 $305 - $30 5 - - $25 - $2,963
114,302
kWh
$2,002
176
kW-months/year
$305
-
$
$30
5
MMBtu
-
-
$
$25
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal