IAC Assessment: GT0625
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0625
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Rotor Disks
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 800
Plant Area (Sq.Ft.) 700,000
Annual Production 12,500 Pieces
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $617,976 27,223,623 kWh $0.02
Electricity Demand $542,415 38,660 kW-months/year $14.03
Electricity Fees $69,623 - $ -
Natural Gas $19,344 5,683 MMBtu $3.40
TOTAL ENERGY COSTS $1,304,558
RECOMMENDED SAVINGS* $869,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $767,537
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ $
01: 3.4155 METER WASTE WATER Savings:
$20,840
Cost:
-
- - - - - - - - - - $20,840 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$20,840
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,500
Cost:
$137,700
$24,359 1,084,408 $19,920 1,420 $2,221 - - - - - - - - - - - $24,359
1,084,408
kWh
$19,920
1,420
kW-months/year
$2,221
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,080
Cost:
$400
$1,962 82,356 - - $118 - - - - - - - - - - - $1,962
82,356
kWh
-
-
kW-months/year
$118
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$19,800
Cost:
$7,150
- - - - - - - - $1,650 1,815 - - $18,150 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,650
1,815
gal
-
-
$
$18,150
-
$
-
-
$
05: 2.7314 REDUCE VENTILATION AIR Savings:
$8,640
Cost:
$20,000
$800 33,411 - - - - $7,840 2,070 - - - - - - - - $800
33,411
kWh
-
-
kW-months/year
-
-
$
$7,840
2,070
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,957
Cost:
$5,695
$1,846 77,667 - - $111 - - - - - - - - - - - $1,846
77,667
kWh
-
-
kW-months/year
$111
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$26,000
Cost:
$1,780
- - - - - - - - $26,000 36,300 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$26,000
36,300
gal
-
-
$
-
-
$
-
-
$
08: 4.6530 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS Savings:
$743,700
Cost:
-
- - - - - - - - - - - - - - $743,700 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$743,700
-
$
TOTAL RECOMMENDED Savings:
$869,517
Cost:
$172,725
$28,967 1,277,842 $19,920 1,420 $2,450 - $7,840 2,070 $27,650 38,115 $20,840 - $18,150 - $743,700 - $28,967
1,277,842
kWh
$19,920
1,420
kW-months/year
$2,450
-
$
$7,840
2,070
MMBtu
$27,650
38,115
gal
$20,840
-
$
$18,150
-
$
$743,700
-
$
TOTAL IMPLEMENTED Savings:
$767,537
Cost:
$13,245
$3,808 160,023 - - $229 - - - $1,650 1,815 - - $18,150 - $743,700 - $3,808
160,023
kWh
-
-
kW-months/year
$229
-
$
-
-
MMBtu
$1,650
1,815
gal
-
-
$
$18,150
-
$
$743,700
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product