IAC logo
IAC Assessment: GT0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Finished Carpet
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 184,680
Annual Production 45,000,000 Thousand Feet
Production Hrs. Annual 2,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,117 2,314,478 kWh $0.03
Electricity Demand $26,860 8,792 kW-months/year $3.06
Electricity Fees $4,362 - $ -
Natural Gas $190,793 44,745 MMBtu $4.26
LPG $36,068 5,152 MMBtu $7.00
TOTAL ENERGY COSTS $336,766
RECOMMENDED SAVINGS* $59,187 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,992
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,741
Cost:
$950
$1,734 59,789 $876 288 $131 - - - - - - - - - - - - - $1,734
59,789
kWh
$876
288
kW-months/year
$131
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$21,185
Cost:
-
- - - - - - - - - - - - - - $21,185 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$21,185
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,580
Cost:
$11,230
$1,000 34,584 $505 168 $75 - - - - - - - - - - - - - $1,000
34,584
kWh
$505
168
kW-months/year
$75
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$2,730
Cost:
$1,420
- - - - - - - - $2,730 2,363,700 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,730
2,363,700
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$400
Cost:
$620
- - - - - - $400 105 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$400
105
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,570
Cost:
$7,580
$1,627 55,979 $821 268 $122 - - - - - - - - - - - - - $1,627
55,979
kWh
$821
268
kW-months/year
$122
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$26,666
Cost:
$4,200
$241 8,206 $121 40 - - - - - - - - $704 - - - $25,600 - $241
8,206
kWh
$121
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$704
-
$
-
-
$
$25,600
-
%
08: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$1,315
Cost:
$438
- - - - - - - - - - $1,315 1,073 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$1,315
1,073
lb
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$59,187
Cost:
$26,438
$4,602 158,558 $2,323 764 $328 - $400 105 $2,730 2,363,700 $1,315 1,073 $704 - $21,185 - $25,600 - $4,602
158,558
kWh
$2,323
764
kW-months/year
$328
-
$
$400
105
MMBtu
$2,730
2,363,700
Tgal
$1,315
1,073
lb
$704
-
$
$21,185
-
$
$25,600
-
%
TOTAL IMPLEMENTED Savings:
$50,992
Cost:
$5,770
$1,975 67,995 $997 328 $131 - $400 105 - - - - $704 - $21,185 - $25,600 - $1,975
67,995
kWh
$997
328
kW-months/year
$131
-
$
$400
105
MMBtu
-
-
Tgal
-
-
lb
$704
-
$
$21,185
-
$
$25,600
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production