IAC logo
IAC Assessment: GT0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Laminated Wood
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 65,000
Annual Production 50,000 Thousand Feet
Production Hrs. Annual 6,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,714 3,547,186 kWh $0.02
Electricity Demand $107,528 6,773 kW-months/year $15.88
Electricity Fees $9,320 - $ -
Natural Gas $141,863 24,234 MMBtu $5.85
TOTAL ENERGY COSTS $363,305
RECOMMENDED SAVINGS* $118,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,860
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$57,241
Cost:
$66,640
- - - - - - - - $(-5,020) (-710) - - - - $62,261 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-5,020)
(-710)
MMBtu
-
-
Tgal
-
-
$
$62,261
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,202
Cost:
-
- - - - - - - - - - - - - - $11,202 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
$11,202
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,860
Cost:
$300
$795 33,705 $963 61 $102 - - - - - - - - - - - - - $795
33,705
kWh
$963
61
kW-months/year
$102
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,350
Cost:
$11,600
$1,435 60,668 $1,727 109 $188 - - - - - - - - - - - - - $1,435
60,668
kWh
$1,727
109
kW-months/year
$188
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$2,485
Cost:
-
- - - - - - $3,385 579 - - - - - - $(-900) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,385
579
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
$(-900)
-
$
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$11,330
Cost:
$10,500
$8,360 148,007 - - - - $2,970 508 - - - - - - - - - - $8,360
148,007
kWh
-
-
kW-months/year
-
-
$
$2,970
508
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
07: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$3,460
Cost:
$1,000
$676 28,722 $818 52 $91 - - - - - - - $1,875 - - - - - $676
28,722
kWh
$818
52
kW-months/year
$91
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$1,875
-
$
-
-
$
-
-
$
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$27,982
Cost:
$2,100
$(-388) (-7,034) - - - - - - - - $28,870 5,510,000 - - - - $(-500) - $(-388)
(-7,034)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$28,870
5,510,000
Tgal
-
-
$
-
-
$
$(-500)
-
$
TOTAL RECOMMENDED Savings:
$118,910
Cost:
$92,140
$10,878 264,068 $3,508 222 $381 - $6,355 1,087 $(-5,020) (-710) $28,870 5,510,000 $1,875 - $72,563 - $(-500) - $10,878
264,068
kWh
$3,508
222
kW-months/year
$381
-
$
$6,355
1,087
MMBtu
$(-5,020)
(-710)
MMBtu
$28,870
5,510,000
Tgal
$1,875
-
$
$72,563
-
$
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$1,860
Cost:
$300
$795 33,705 $963 61 $102 - - - - - - - - - - - - - $795
33,705
kWh
$963
61
kW-months/year
$102
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost