IAC logo
IAC Assessment: GT0636
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0636
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Kayaks
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 125,000
Annual Production 27,500 Pieces
Production Hrs. Annual 6,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,221 2,074,150 kWh $0.05
Electricity Demand $18,116 3,150 kW-months/year $5.75
Electricity Fees $6,920 - $ -
Natural Gas $158,783 29,356 MMBtu $5.41
TOTAL ENERGY COSTS $281,040
RECOMMENDED SAVINGS* $904,864 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$49,000
Cost:
-
- - - - - - $49,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$49,000
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,227
Cost:
-
- - - - - - $8,227 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,227
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,388
Cost:
$150
$5,767 144,197 $621 108 - - - - - - $5,767
144,197
kWh
$621
108
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,129
Cost:
$4,740
$702 17,878 $366 60 $61 - - - - - $702
17,878
kWh
$366
60
kW-months/year
$61
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,095
Cost:
-
$5,750 71,805 - - $345 - - - - - $5,750
71,805
kWh
-
-
kW-months/year
$345
-
$
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,075
Cost:
-
- - - - - - $6,075 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,075
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,950
Cost:
$6,500
- - - - - - $2,950 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,950
-
$
-
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$825,000
Cost:
-
- - - - - - - - $825,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$825,000
-
$
TOTAL RECOMMENDED Savings:
$904,864
Cost:
$11,390
$12,219 233,880 $987 168 $406 - $66,252 - $825,000 - $12,219
233,880
kWh
$987
168
kW-months/year
$406
-
$
$66,252
-
$
$825,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Product