IAC Assessment: GT0642
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0642
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Patterned Carpet
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $100,000,000-$500,000,000
# of Employees 490
Plant Area (Sq.Ft.) 342,000
Annual Production 36,900,000 Thousand Feet
Production Hrs. Annual 7,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $313,362 8,913,247 kWh $0.04
Electricity Demand $118,454 24,678 kW-months/year $4.80
Electricity Fees $16,642 - $ -
Natural Gas $316,073 62,678 MMBtu $5.04
LPG $19,934 1,879 MMBtu $10.61
Fuel Oil #2 $11,854 1,417 MMBtu $8.37
TOTAL ENERGY COSTS $796,319
RECOMMENDED SAVINGS* $224,713 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Natural Gas LPG Administrative Changes Water Consumption Natural Gas LPG Administrative Changes Water Consumption
$ MMBtu $ MMBtu $ $ $ Tgal
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$65,180
Cost:
$100,000
- - - - $65,180 - - - -
-
MMBtu
-
-
MMBtu
$65,180
-
$
-
-
Tgal
02: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$8,990
Cost:
-
- - - - $8,990 - - - -
-
MMBtu
-
-
MMBtu
$8,990
-
$
-
-
Tgal
03: 2.8112 COMBINE UTILITY METERS Savings:
$41,000
Cost:
-
- - - - $41,000 - - - -
-
MMBtu
-
-
MMBtu
$41,000
-
$
-
-
Tgal
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$23,695
Cost:
$13,000
$23,280 3,726 - - - - $415 - $23,280
3,726
MMBtu
-
-
MMBtu
-
-
$
$415
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$9,530
Cost:
$12,500
$8,190 1,638 - - - - $1,340 - $8,190
1,638
MMBtu
-
-
MMBtu
-
-
$
$1,340
-
Tgal
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$26,700
Cost:
$40,500
$19,500 3,900 - - $7,200 - - - $19,500
3,900
MMBtu
-
-
MMBtu
$7,200
-
$
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$35,596
Cost:
$52,700
$30,610 6,122 - - $136 - $4,850 - $30,610
6,122
MMBtu
-
-
MMBtu
$136
-
$
$4,850
-
Tgal
08: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$14,022
Cost:
$27,000
$(-5,900) (-1,879) $19,922 1,879 - - - - $(-5,900)
(-1,879)
MMBtu
$19,922
1,879
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$224,713
Cost:
$245,700
$75,680 13,507 $19,922 1,879 $122,506 - $6,605 - $75,680
13,507
MMBtu
$19,922
1,879
MMBtu
$122,506
-
$
$6,605
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ MMBtu $ MMBtu $ $ $ Tgal
Natural Gas LPG Administrative Changes Water Consumption Natural Gas LPG Administrative Changes Water Consumption