IAC logo
IAC Assessment: GT0647
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0647
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Stamped Metal Products
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 30,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,486 699,590 kWh $0.04
Electricity Demand $23,391 2,034 kW-months/year $11.50
Electricity Fees $8,339 - $ -
Natural Gas $2,325 315 MMBtu $7.38
TOTAL ENERGY COSTS $59,311
RECOMMENDED SAVINGS* $5,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,954
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,309
Cost:
$3,080
$694 19,930 $615 54 - - - - - - $694
19,930
kWh
$615
54
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$645
Cost:
$2,200
$445 12,603 $200 17 - - - - - - $445
12,603
kWh
$200
17
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$860
Cost:
$4,625
- - - - $860 117 - - - - -
-
kWh
-
-
kW-months/year
$860
117
MMBtu
-
-
lb
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$430
Cost:
$1,992
- - - - $430 58 - - - - -
-
kWh
-
-
kW-months/year
$430
58
MMBtu
-
-
lb
-
-
$
05: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$2,260
Cost:
$3,125
- - - - - - $770 525 $1,490 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$770
525
lb
$1,490
-
$
TOTAL RECOMMENDED Savings:
$5,504
Cost:
$15,022
$1,139 32,533 $815 71 $1,290 175 $770 525 $1,490 - $1,139
32,533
kWh
$815
71
kW-months/year
$1,290
175
MMBtu
$770
525
lb
$1,490
-
$
TOTAL IMPLEMENTED Savings:
$1,954
Cost:
$5,280
$1,139 32,533 $815 71 - - - - - - $1,139
32,533
kWh
$815
71
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes