IAC Assessment: GT0648
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0648
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Industrial Belts
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $1,000,000-$5,000,000
# of Employees 34
Plant Area (Sq.Ft.) 10,500
Annual Production 60,000 Pounds
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,535 201,348 kWh $0.11
Natural Gas $4,242 662 MMBtu $6.41
TOTAL ENERGY COSTS $27,970
RECOMMENDED SAVINGS* $10,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,500
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes
$ kWh $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,034
Cost:
$4,875
$1,034 11,430 - - - - $1,034
11,430
kWh
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$153
Cost:
$168
$153 1,758 - - - - $153
1,758
kWh
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$97
Cost:
$52
$97 1,172 - - - - $97
1,172
kWh
-
-
lb
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$7,500
Cost:
-
- - - - $7,500 - -
-
kWh
-
-
lb
$7,500
-
$
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,000
Cost:
$1,000
- - - - $2,000 - -
-
kWh
-
-
lb
$2,000
-
$
06: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$45
Cost:
-
- - $45 3,000 - - -
-
kWh
$45
3,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$10,829
Cost:
$6,095
$1,284 14,360 $45 3,000 $9,500 - $1,284
14,360
kWh
$45
3,000
lb
$9,500
-
$
TOTAL IMPLEMENTED Savings:
$9,500
Cost:
$1,000
- - - - $9,500 - -
-
kWh
-
-
lb
$9,500
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes