IAC logo
IAC Assessment: GT0661
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0661
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Fluorescent Lighting
NAICS n/a
SIC 3645 - Residential Lighting Fixtures
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 356,800
Annual Production 10,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $264,438 4,130,715 kWh $0.06
Natural Gas $39,080 4,480 MMBtu $8.72
LPG $16,777 2,912 MMBtu $5.76
TOTAL ENERGY COSTS $518,193
RECOMMENDED SAVINGS* $918,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $891,108
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ lb $ $ $ $ $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$20,275
Cost:
$4,960
$20,275 316,530 - - - - - - - - - - $20,275
316,530
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,938
Cost:
$300
$1,938 30,188 - - - - - - - - - - $1,938
30,188
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,740
Cost:
$750
$5,740 89,683 - - - - - - - - - - $5,740
89,683
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$457
Cost:
$994
$457 7,034 - - - - - - - - - - $457
7,034
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$684
Cost:
$1,000
- - $187 3,200 - - - - $497 - - - -
-
kWh
$187
3,200
lb
-
-
$
-
-
$
$497
-
$
-
-
$
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$215,560
Cost:
$112,500
- - - - $(-11,000) - $226,560 - - - - - -
-
kWh
-
-
lb
$(-11,000)
-
$
$226,560
-
$
-
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$673,610
Cost:
$245,000
- - - - - - $23,610 - - - $650,000 - -
-
kWh
-
-
lb
-
-
$
$23,610
-
$
-
-
$
$650,000
-
$
TOTAL RECOMMENDED Savings:
$918,264
Cost:
$365,504
$28,410 443,435 $187 3,200 $(-11,000) - $250,170 - $497 - $650,000 - $28,410
443,435
kWh
$187
3,200
lb
$(-11,000)
-
$
$250,170
-
$
$497
-
$
$650,000
-
$
TOTAL IMPLEMENTED Savings:
$891,108
Cost:
$357,800
$1,938 30,188 - - $(-11,000) - $250,170 - - - $650,000 - $1,938
30,188
kWh
-
-
lb
$(-11,000)
-
$
$250,170
-
$
-
-
$
$650,000
-
$
Savings
Cost
$ kWh $ lb $ $ $ $ $ $ $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product