IAC Assessment: GT0666
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0666
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Gypsum Wallboard
NAICS n/a
SIC 3275 - Gypsum Products
Sales $50,000,000-$100,000,000
# of Employees 96
Plant Area (Sq.Ft.) 600,000
Annual Production 362,000 Thousand Feet
Production Hrs. Annual 8,272
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $548,479 19,430,833 kWh $0.03
Electricity Demand $286,545 32,562 kW-months/year $8.80
Electricity Fees $18,882 - $ -
Natural Gas $2,576,743 824,797 MMBtu $3.12
TOTAL ENERGY COSTS $3,430,979
RECOMMENDED SAVINGS* $545,717 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $452,161
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$30,744
Cost:
$35,000
- - - - - - - - - - $30,744 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$30,744
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$366,782
Cost:
$180,000
- - - - - - $366,782 119,279 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$366,782
119,279
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,440
Cost:
$450
$2,092 65,358 $1,151 130 $197 - - - - - - - $2,092
65,358
kWh
$1,151
130
kW-months/year
$197
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,598
Cost:
$2,500
$7,147 223,329 $2,851 324 $600 - - - - - - - $7,147
223,329
kWh
$2,851
324
kW-months/year
$600
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$30,735
Cost:
$8,017
$20,727 647,714 $8,268 939 $1,740 - - - - - - - $20,727
647,714
kWh
$8,268
939
kW-months/year
$1,740
-
$
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,354
Cost:
$3,900
$1,523 49,531 $634 72 $197 - - - - - - - $1,523
49,531
kWh
$634
72
kW-months/year
$197
-
$
-
-
MMBtu
-
-
lb
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,967
Cost:
$8,398
- - - - - - $7,967 2,591 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,967
2,591
MMBtu
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$38,797
Cost:
$151,526
$26,164 817,702 $10,454 1,188 $2,179 - - - - - - - $26,164
817,702
kWh
$10,454
1,188
kW-months/year
$2,179
-
$
-
-
MMBtu
-
-
lb
-
-
$
09: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$52,500
Cost:
$45,000
- - - - - - - - $52,500 22,176 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$52,500
22,176
lb
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,800
Cost:
-
- - - - - - - - $1,800 60,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,800
60,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$545,717
Cost:
$434,791
$57,653 1,803,634 $23,358 2,653 $4,913 - $374,749 121,870 $54,300 82,176 $30,744 - $57,653
1,803,634
kWh
$23,358
2,653
kW-months/year
$4,913
-
$
$374,749
121,870
MMBtu
$54,300
82,176
lb
$30,744
-
$
TOTAL IMPLEMENTED Savings:
$452,161
Cost:
$369,476
$35,403 1,106,389 $14,456 1,642 $2,976 - $366,782 119,279 $1,800 60,000 $30,744 - $35,403
1,106,389
kWh
$14,456
1,642
kW-months/year
$2,976
-
$
$366,782
119,279
MMBtu
$1,800
60,000
lb
$30,744
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes