IAC logo
IAC Assessment: GT0667
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0667
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product carpet
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $1,000,000-$5,000,000
# of Employees 130
Plant Area (Sq.Ft.) 160,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,448 1,332,943 kWh $0.02
Electricity Demand $24,946 5,177 kW-months/year $4.82
Electricity Fees $3,138 - $ -
Natural Gas $10,122 1,891 MMBtu $5.35
TOTAL ENERGY COSTS $80,551
RECOMMENDED SAVINGS* $75,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,454
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$122
Cost:
$350
$115 3,810 - - $7 - - - - - $115
3,810
kWh
-
-
kW-months/year
$7
-
$
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$162
Cost:
$50
$153 5,862 - - $9 - - - - - $153
5,862
kWh
-
-
kW-months/year
$9
-
$
-
-
lb
-
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$182
Cost:
-
$172 6,448 - - $10 - - - - - $172
6,448
kWh
-
-
kW-months/year
$10
-
$
-
-
lb
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$62
Cost:
$200
$58 2,345 - - $4 - - - - - $58
2,345
kWh
-
-
kW-months/year
$4
-
$
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,292
Cost:
$18,568
$4,554 174,971 $1,382 24 $356 - - - - - $4,554
174,971
kWh
$1,382
24
kW-months/year
$356
-
$
-
-
lb
-
-
$
06: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$52,560
Cost:
$8,050
- - - - - - - - $52,560 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$52,560
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$1,740
Cost:
$1,719
- - - - - - - - $1,740 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$1,740
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$14,790
Cost:
-
- - - - - - $14,790 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,790
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$75,910
Cost:
$28,937
$5,052 193,436 $1,382 24 $386 - $14,790 - $54,300 - $5,052
193,436
kWh
$1,382
24
kW-months/year
$386
-
$
$14,790
-
lb
$54,300
-
$
TOTAL IMPLEMENTED Savings:
$6,454
Cost:
$18,618
$4,707 180,833 $1,382 24 $365 - - - - - $4,707
180,833
kWh
$1,382
24
kW-months/year
$365
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes