IAC Assessment: GT0669
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0669
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product plastic bottles
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 87,900
Annual Production 300,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,933 22,580,598 kWh $0.02
Electricity Demand $341,090 25,236 kW-months/year $13.52
Electricity Fees $177,184 - $ -
TOTAL ENERGY COSTS $1,063,716
RECOMMENDED SAVINGS* $256,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,363
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ $ $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,756
Cost:
$60,795
$6,312 197,245 $444 - - - - - $6,312
197,245
kWh
$444
-
$
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$641
Cost:
$1,250
$599 18,757 $42 - - - - - $599
18,757
kWh
$42
-
$
-
-
lb
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,935
Cost:
$6,800
$4,613 144,197 $322 - - - - - $4,613
144,197
kWh
$322
-
$
-
-
lb
-
-
$
04: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$10,870
Cost:
$7,700
$10,161 317,409 $709 - - - - - $10,161
317,409
kWh
$709
-
$
-
-
lb
-
-
$
05: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$113,437
Cost:
-
$19,800 618,699 $450 - - - $93,187 - $19,800
618,699
kWh
$450
-
$
-
-
lb
$93,187
-
$
06: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$2,200
Cost:
$1,000
$2,200 68,875 - - - - - - $2,200
68,875
kWh
-
-
$
-
-
lb
-
-
$
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$8,844
Cost:
$32,000
$8,844 276,377 - - - - - - $8,844
276,377
kWh
-
-
$
-
-
lb
-
-
$
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$550
Cost:
$200
- - - - $550 24,450 - - -
-
kWh
-
-
$
$550
24,450
lb
-
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$108,000
Cost:
$100,000
- - - - - - $108,000 - -
-
kWh
-
-
$
-
-
lb
$108,000
-
$
TOTAL RECOMMENDED Savings:
$256,233
Cost:
$209,745
$52,529 1,641,559 $1,967 - $550 24,450 $201,187 - $52,529
1,641,559
kWh
$1,967
-
$
$550
24,450
lb
$201,187
-
$
TOTAL IMPLEMENTED Savings:
$137,363
Cost:
$102,045
$42,368 1,324,150 $1,258 - $550 24,450 $93,187 - $42,368
1,324,150
kWh
$1,258
-
$
$550
24,450
lb
$93,187
-
$
Savings
Cost
$ kWh $ $ $ lb $ $
Electricity Usage Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Fees Solid Waste (non-haz) Personnel Changes