Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1999 |
Principal Product | Printed Bags |
NAICS | n/a |
SIC | 3081 - Unsupported Plastics Film & Sheet |
Sales | $1,000,000-$5,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 84,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $60,100 | 1,710,434 | kWh | $0.04 |
Electricity Fees | $6,919 | - | $ | - |
Natural Gas | $56,440 | 10,403 | MMBtu | $5.43 |
TOTAL ENERGY COSTS | $141,939 | |||
RECOMMENDED SAVINGS* | $46,507 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Administrative Changes | Electricity Usage | Natural Gas | Other Liquid (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $6,000 Cost: - |
- | - | - | - | - | - | $6,000 | - |
- - kWh |
- - MMBtu |
- - gal |
$6,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $5,110 Cost: $7,000 |
$1,510 | 38,687 | - | - | - | - | $3,600 | - |
$1,510 38,687 kWh |
- - MMBtu |
- - gal |
$3,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,422 Cost: $7,508 |
$2,422 | 58,617 | - | - | - | - | - | - |
$2,422 58,617 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $3,118 Cost: $5,050 |
- | - | $3,118 | 579 | - | - | - | - |
- - kWh |
$3,118 579 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $410 Cost: $300 |
$410 | 10,551 | - | - | - | - | - | - |
$410 10,551 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES |
Savings: $29,340 Cost: - |
- | - | - | - | $29,340 | 8,655 | - | - |
- - kWh |
- - MMBtu |
$29,340 8,655 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE |
Savings: $107 Cost: $320 |
- | - | - | - | $107 | 474 | - | - |
- - kWh |
- - MMBtu |
$107 474 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,507 Cost: $20,178 |
$4,342 | 107,855 | $3,118 | 579 | $29,447 | 9,129 | $9,600 | - | $4,342 107,855 kWh |
$3,118 579 MMBtu |
$29,447 9,129 gal |
$9,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Administrative Changes | Electricity Usage | Natural Gas | Other Liquid (haz) | Administrative Changes |