Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Printed Bags
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 35,000
Annual Production 84,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,100 1,710,434 kWh $0.04
Electricity Fees $6,919 - $ -
Natural Gas $56,440 10,403 MMBtu $5.43
TOTAL ENERGY COSTS $141,939
RECOMMENDED SAVINGS* $46,507 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ MMBtu $ gal $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$6,000
Cost:
-
- - - - - - $6,000 - -
-
kWh
-
-
MMBtu
-
-
gal
$6,000
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$5,110
Cost:
$7,000
$1,510 38,687 - - - - $3,600 - $1,510
38,687
kWh
-
-
MMBtu
-
-
gal
$3,600
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,422
Cost:
$7,508
$2,422 58,617 - - - - - - $2,422
58,617
kWh
-
-
MMBtu
-
-
gal
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,118
Cost:
$5,050
- - $3,118 579 - - - - -
-
kWh
$3,118
579
MMBtu
-
-
gal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$410
Cost:
$300
$410 10,551 - - - - - - $410
10,551
kWh
-
-
MMBtu
-
-
gal
-
-
$
06: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES Savings:
$29,340
Cost:
-
- - - - $29,340 8,655 - - -
-
kWh
-
-
MMBtu
$29,340
8,655
gal
-
-
$
07: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$107
Cost:
$320
- - - - $107 474 - - -
-
kWh
-
-
MMBtu
$107
474
gal
-
-
$
TOTAL RECOMMENDED Savings:
$46,507
Cost:
$20,178
$4,342 107,855 $3,118 579 $29,447 9,129 $9,600 - $4,342
107,855
kWh
$3,118
579
MMBtu
$29,447
9,129
gal
$9,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $
Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Administrative Changes