IAC logo
IAC Assessment: GT0676
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0676
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Glass Panels
NAICS n/a
SIC 3211 - Flat Glass
Sales $1,000,000-$5,000,000
# of Employees 27
Plant Area (Sq.Ft.) 140,000
Annual Production 780,750 Thousand Feet
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,221 1,282,825 kWh $0.02
Electricity Demand $25,436 2,013 kW-months/year $12.64
Electricity Fees $3,616 - $ -
Natural Gas $295,343 91,179 MMBtu $3.24
TOTAL ENERGY COSTS $390,320
RECOMMENDED SAVINGS* $115,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,148
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $ $ %
01: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$3,081
Cost:
$500
- - - - $1,337 990,600 - - - - $1,744 - - - -
-
kWh
-
-
MMBtu
$1,337
990,600
Tgal
-
-
lb
-
-
$
$1,744
-
$
-
-
%
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$11,148
Cost:
-
- - - - - - $11,148 895,200 - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$11,148
895,200
lb
-
-
$
-
-
$
-
-
%
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$29,047
Cost:
$12,000
- - $29,047 8,968 - - - - - - - - - - -
-
kWh
$29,047
8,968
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$20,293
Cost:
$15,000
- - $20,293 6,265 - - - - - - - - - - -
-
kWh
$20,293
6,265
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
05: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$33,650
Cost:
$18,000
- - - - - - - - - - - - $33,650 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$33,650
-
%
06: 2.8112 COMBINE UTILITY METERS Savings:
$292
Cost:
-
- - - - - - - - $292 - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$292
-
$
-
-
$
-
-
%
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,295
Cost:
$100
- - - - $945 700,000 - - - - $350 - - - -
-
kWh
-
-
MMBtu
$945
700,000
Tgal
-
-
lb
-
-
$
$350
-
$
-
-
%
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$16,324
Cost:
$35,000
$2,507 78,253 - - $5,103 5,796,000 - - - - $8,714 - - - $2,507
78,253
kWh
-
-
MMBtu
$5,103
5,796,000
Tgal
-
-
lb
-
-
$
$8,714
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$115,130
Cost:
$80,600
$2,507 78,253 $49,340 15,233 $7,385 7,486,600 $11,148 895,200 $292 - $10,808 - $33,650 - $2,507
78,253
kWh
$49,340
15,233
MMBtu
$7,385
7,486,600
Tgal
$11,148
895,200
lb
$292
-
$
$10,808
-
$
$33,650
-
%
TOTAL IMPLEMENTED Savings:
$11,148
Cost:
-
- - - - - - $11,148 895,200 - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$11,148
895,200
lb
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $ $ %
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production