IAC logo
IAC Assessment: GT0683
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0683
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Carpet
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 240,000
Annual Production 106,389,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,407 9,895,663 kWh $0.02
Electricity Demand $110,070 30,375 kW-months/year $3.62
Electricity Fees $21,533 - $ -
Natural Gas $415,981 117,345 MMBtu $3.54
TOTAL ENERGY COSTS $794,181
RECOMMENDED SAVINGS* $313,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,554
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
01: 2.8112 COMBINE UTILITY METERS Savings:
$14,609
Cost:
-
- - - - - - - - - - $14,609 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$14,609
-
$
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$180,287
Cost:
$358,400
- - - - $180,287 50,928 - - - - - - - - -
-
kWh
-
-
kW-months/year
$180,287
50,928
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,689
Cost:
$2,080
$998 39,859 $691 192 - - - - - - - - - - $998
39,859
kWh
$691
192
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$59,893
Cost:
$12,000
- - - - - - - - $59,893 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$59,893
-
$
-
-
$
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,590
Cost:
$108,696
$3,905 155,627 $1,685 468 - - - - - - - - - - $3,905
155,627
kWh
$1,685
468
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$5,364
Cost:
$11,500
- - - - - - - - - - - - $5,364 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$5,364
-
Tgal
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$595
Cost:
$1,275
- - - - $595 168 - - - - - - - - -
-
kWh
-
-
kW-months/year
$595
168
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$43,775
Cost:
$28,880
$69,840 2,793,669 $30,171 8,381 $(-56,236) (-15,886) - - - - - - - - $69,840
2,793,669
kWh
$30,171
8,381
kW-months/year
$(-56,236)
(-15,886)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
09: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,190
Cost:
$1,000
- - - - - - $2,190 16 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,190
16
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$313,992
Cost:
$523,831
$74,743 2,989,155 $32,547 9,041 $124,646 35,210 $2,190 16 $59,893 - $14,609 - $5,364 - $74,743
2,989,155
kWh
$32,547
9,041
kW-months/year
$124,646
35,210
MMBtu
$2,190
16
lb
$59,893
-
$
$14,609
-
$
$5,364
-
Tgal
TOTAL IMPLEMENTED Savings:
$7,554
Cost:
$12,500
- - - - - - $2,190 16 - - - - $5,364 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,190
16
lb
-
-
$
-
-
$
$5,364
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption