IAC Assessment: GT0687
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0687
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Automobile Assembly
NAICS n/a
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 200,000
Annual Production 165,500 Pieces
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,099 1,238,277 kWh $0.09
Electricity Fees $6,903 - $ -
Natural Gas $25,576 3,798 MMBtu $6.73
TOTAL ENERGY COSTS $216,336
RECOMMENDED SAVINGS* $152,593 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $91,210
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ $ $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
01: 2.8112 COMBINE UTILITY METERS Savings:
$83,824
Cost:
-
- - - - - - - - - - $83,824 - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$83,824
-
$
-
-
$
-
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$33,596
Cost:
-
- - $1,902 - - - - - - - $31,694 - - - - - -
-
kWh
$1,902
-
$
-
-
MMBtu
-
-
lb
-
-
$
$31,694
-
$
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$608
Cost:
$950
$574 6,155 $34 - - - - - - - - - - - - - $574
6,155
kWh
$34
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,030
Cost:
$1,350
$972 10,551 $58 - - - - - - - - - - - - - $972
10,551
kWh
$58
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$5,787
Cost:
-
- - - - - - $2,187 360,000 - - - - $3,600 - - - -
-
kWh
-
-
$
-
-
MMBtu
$2,187
360,000
lb
-
-
$
-
-
$
$3,600
-
$
-
-
Tgal
06: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$25,338
Cost:
$43,000
$(-1,597) (-16,413) - - $13,131 1,894 - - $13,804 - - - - - - - $(-1,597)
(-16,413)
kWh
-
-
$
$13,131
1,894
MMBtu
-
-
lb
$13,804
-
$
-
-
$
-
-
$
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$991
Cost:
$742
- - - - - - - - - - - - - - $991 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$991
-
Tgal
08: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,045
Cost:
$700
- - - - - - $1,045 4,250 - - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
$1,045
4,250
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$374
Cost:
$150
- - - - $374 56 - - - - - - - - - - -
-
kWh
-
-
$
$374
56
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$152,593
Cost:
$46,892
$(-51) 293 $1,994 - $13,505 1,950 $3,232 364,250 $13,804 - $115,518 - $3,600 - $991 - $(-51)
293
kWh
$1,994
-
$
$13,505
1,950
MMBtu
$3,232
364,250
lb
$13,804
-
$
$115,518
-
$
$3,600
-
$
$991
-
Tgal
TOTAL IMPLEMENTED Savings:
$91,210
Cost:
$1,692
$574 6,155 $34 - - - $2,187 360,000 - - $83,824 - $3,600 - $991 - $574
6,155
kWh
$34
-
$
-
-
MMBtu
$2,187
360,000
lb
-
-
$
$83,824
-
$
$3,600
-
$
$991
-
Tgal
Savings
Cost
$ kWh $ $ $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption