IAC Assessment: GT0692
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0692
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Plastic Gears
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 40,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 8,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,260 4,945,194 kWh $0.04
Natural Gas $651 88 MMBtu $7.40
TOTAL ENERGY COSTS $186,689
RECOMMENDED SAVINGS* $113,129 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,857
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$7,357
Cost:
$2,000
$2,557 52,462 - - - - $4,800 - - - - - $2,557
52,462
kWh
-
-
MMBtu
-
-
Tgal
$4,800
-
$
-
-
$
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$7,810
Cost:
$1,000
$7,810 330,305 - - - - - - - - - - $7,810
330,305
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,690
Cost:
$4,000
$6,690 204,865 - - - - - - - - - - $6,690
204,865
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,465
Cost:
$500
- - - - $3,465 480,000 - - - - - - -
-
kWh
-
-
MMBtu
$3,465
480,000
Tgal
-
-
$
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,500
Cost:
$170,000
$44,500 1,199,590 - - - - - - - - $9,000 - $44,500
1,199,590
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$9,000
-
$
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$9,831
Cost:
$26,400
$14,927 54,220 $(-5,096) (-690) - - - - - - - - $14,927
54,220
kWh
$(-5,096)
(-690)
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$19,321
Cost:
$41,750
$19,321 429,953 - - - - - - - - - - $19,321
429,953
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,155
Cost:
-
- - - - - - - - $5,155 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$5,155
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$113,129
Cost:
$245,650
$95,805 2,271,395 $(-5,096) (-690) $3,465 480,000 $4,800 - $5,155 - $9,000 - $95,805
2,271,395
kWh
$(-5,096)
(-690)
MMBtu
$3,465
480,000
Tgal
$4,800
-
$
$5,155
-
$
$9,000
-
$
TOTAL IMPLEMENTED Savings:
$21,857
Cost:
$7,000
$17,057 587,632 - - - - $4,800 - - - - - $17,057
587,632
kWh
-
-
MMBtu
-
-
Tgal
$4,800
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material