IAC logo
IAC Assessment: GT0694
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0694
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Lawnmowers
NAICS n/a
SIC 3524 - Lawn And Garden Equipment
Sales $10,000,000-$50,000,000
# of Employees 697
Plant Area (Sq.Ft.) 375,491
Annual Production 2,135,088 Pieces
Production Hrs. Annual 5,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,006 13,580,891 kWh $0.03
Electricity Demand $274,482 23,124 kW-months/year $11.87
Electricity Fees $49,880 - $ -
Natural Gas $113,058 45,220 MMBtu $2.50
TOTAL ENERGY COSTS $911,280
RECOMMENDED SAVINGS* $264,258 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $126,943
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,919
Cost:
$1,150
$5,584 146,835 - - $335 - - - - - - - - - - - $5,584
146,835
kWh
-
-
kW-months/year
$335
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$870
Cost:
-
- - - - - - $1,320 529 - - $(-450) - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,320
529
MMBtu
-
-
gal
$(-450)
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,412
Cost:
$16,800
$5,106 134,525 - - $306 - - - - - - - - - - - $5,106
134,525
kWh
-
-
kW-months/year
$306
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,002
Cost:
$11,083
$1,889 49,824 - - $113 - - - - - - - - - - - $1,889
49,824
kWh
-
-
kW-months/year
$113
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$20,316
Cost:
$3,940
$9,258 419,109 $9,908 835 $1,150 - - - - - - - - - - - $9,258
419,109
kWh
$9,908
835
kW-months/year
$1,150
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,224
Cost:
$8,700
$3,985 104,924 - - $239 - - - - - - - - - - - $3,985
104,924
kWh
-
-
kW-months/year
$239
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$88,200
Cost:
$34,000
- - - - - - - - - - - - - - $88,200 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$88,200
-
$
08: 2.2514 COVER OPEN TANKS Savings:
$6,100
Cost:
$5,390
- - - - - - $6,100 2,440 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,100
2,440
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
09: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$2,967
Cost:
$9,200
$1,082 26,964 - - - - $1,885 754 - - - - - - - - $1,082
26,964
kWh
-
-
kW-months/year
-
-
$
$1,885
754
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
10: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$5,073
Cost:
$3,500
- - - - - - - - - - $3,453 - $1,620 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$3,453
-
$
$1,620
-
$
-
-
$
11: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$123,175
Cost:
$50,000
- - - - - - - - $118,765 32,700 $4,410 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$118,765
32,700
gal
$4,410
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$264,258
Cost:
$143,763
$26,904 882,181 $9,908 835 $2,143 - $9,305 3,723 $118,765 32,700 $7,413 - $1,620 - $88,200 - $26,904
882,181
kWh
$9,908
835
kW-months/year
$2,143
-
$
$9,305
3,723
MMBtu
$118,765
32,700
gal
$7,413
-
$
$1,620
-
$
$88,200
-
$
TOTAL IMPLEMENTED Savings:
$126,943
Cost:
$75,673
$25,822 855,217 $9,908 835 $2,143 - $1,320 529 - - $(-450) - - - $88,200 - $25,822
855,217
kWh
$9,908
835
kW-months/year
$2,143
-
$
$1,320
529
MMBtu
-
-
gal
$(-450)
-
$
-
-
$
$88,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Primary Product