Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2000 |
Principal Product | Light Truck Transmissions |
NAICS | n/a |
SIC | 3568 - Power Transmission Equipment, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 171,000 |
Annual Production | 80,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $219,403 | 8,601,407 | kWh | $0.03 |
Electricity Demand | $176,130 | 14,658 | kW-months/year | $12.02 |
Electricity Fees | $81,013 | - | $ | - |
Natural Gas | $42,175 | 7,909 | MMBtu | $5.33 |
TOTAL ENERGY COSTS | $519,081 | |||
RECOMMENDED SAVINGS* | $162,143 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,601 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,305 Cost: $250 |
$2,174 | 57,151 | $131 | - | - | - | - | - | - | - | - | - |
$2,174 57,151 kWh |
$131 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $45,153 Cost: $5,000 |
$716 | 5,569 | - | - | $41,270 | 7,743 | - | - | - | - | $3,167 | - |
$716 5,569 kWh |
- - $ |
$41,270 7,743 MMBtu |
- - lb |
- - $ |
$3,167 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,306 Cost: $8,892 |
$3,306 | 82,063 | - | - | - | - | - | - | - | - | - | - |
$3,306 82,063 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,317 Cost: $1,375 |
$1,242 | 32,532 | $75 | - | - | - | - | - | - | - | - | - |
$1,242 32,532 kWh |
$75 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,419 Cost: $8,778 |
$2,284 | 59,203 | $135 | - | - | - | - | - | - | - | - | - |
$2,284 59,203 kWh |
$135 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $100,083 Cost: $160,000 |
$100,083 | 2,227,433 | - | - | - | - | - | - | - | - | - | - |
$100,083 2,227,433 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $7,200 Cost: - |
- | - | - | - | - | - | - | - | $7,200 | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
$7,200 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $360 Cost: - |
- | - | - | - | - | - | $360 | 10,000 | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
$360 10,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $162,143 Cost: $184,295 |
$109,805 | 2,463,951 | $341 | - | $41,270 | 7,743 | $360 | 10,000 | $7,200 | - | $3,167 | - | $109,805 2,463,951 kWh |
$341 - $ |
$41,270 7,743 MMBtu |
$360 10,000 lb |
$7,200 - $ |
$3,167 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,601 Cost: $10,403 |
$5,700 | 148,886 | $341 | - | - | - | $360 | 10,000 | $7,200 | - | - | - | $5,700 148,886 kWh |
$341 - $ |
- - MMBtu |
$360 10,000 lb |
$7,200 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |