IAC Assessment: GT0707
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0707
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Smoked Meats
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 40,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,617 1,564,329 kWh $0.03
Electricity Demand $24,560 2,317 kW-months/year $10.60
Electricity Fees $9,033 - $ -
Natural Gas $34,079 5,529 MMBtu $6.16
TOTAL ENERGY COSTS $139,124
RECOMMENDED SAVINGS* $68,977 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,771
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ Tgal
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$5,290
Cost:
$3,000
- - - - - - $5,290 859 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,290
859
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$6,057
Cost:
$5,500
$1,669 56,000 $776 73 $172 - - - - - $3,440 - - - - - $1,669
56,000
kWh
$776
73
kW-months/year
$172
-
$
-
-
MMBtu
-
-
lb
$3,440
-
$
-
-
$
-
-
Tgal
03: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,040
Cost:
$6,700
- - - - - - - - $2,520 168,000 $(-3,000) - $2,520 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,520
168,000
lb
$(-3,000)
-
$
$2,520
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,680
Cost:
$3,496
$915 30,716 $654 62 $111 - - - - - - - - - - - $915
30,716
kWh
$654
62
kW-months/year
$111
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$103
Cost:
$72
$56 1,887 $40 4 $7 - - - - - - - - - - - $56
1,887
kWh
$40
4
kW-months/year
$7
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$7,808
Cost:
-
- - - - - - $1,860 302 - - - - - - $5,948 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,860
302
MMBtu
-
-
lb
-
-
$
-
-
$
$5,948
-
Tgal
07: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$45,820
Cost:
-
- - - - - - $2,500 406 - - $36,000 - - - $7,320 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,500
406
MMBtu
-
-
lb
$36,000
-
$
-
-
$
$7,320
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$179
Cost:
$250
$167 5,600 - - $12 - - - - - - - - - - - $167
5,600
kWh
-
-
kW-months/year
$12
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$68,977
Cost:
$19,018
$2,807 94,203 $1,470 139 $302 - $9,650 1,567 $2,520 168,000 $36,440 - $2,520 - $13,268 - $2,807
94,203
kWh
$1,470
139
kW-months/year
$302
-
$
$9,650
1,567
MMBtu
$2,520
168,000
lb
$36,440
-
$
$2,520
-
$
$13,268
-
Tgal
TOTAL IMPLEMENTED Savings:
$55,771
Cost:
$6,772
$56 1,887 $40 4 $7 - $4,360 708 $2,520 168,000 $33,000 - $2,520 - $13,268 - $56
1,887
kWh
$40
4
kW-months/year
$7
-
$
$4,360
708
MMBtu
$2,520
168,000
lb
$33,000
-
$
$2,520
-
$
$13,268
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption