IAC logo
IAC Assessment: GT0715
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0715
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Aluminum Extrusions
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $50,000,000-$100,000,000
# of Employees 380
Plant Area (Sq.Ft.) 460,000
Annual Production 53,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $915,482 27,301,732 kWh $0.03
Natural Gas $1,884,118 369,607 MMBtu $5.10
TOTAL ENERGY COSTS $2,820,900
RECOMMENDED SAVINGS* $430,529 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,859
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,210
Cost:
-
$7,210 215,250 - - - - - - - - $7,210
215,250
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,380
Cost:
-
- - $2,380 643 - - - - - - -
-
kWh
$2,380
643
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$33,470
Cost:
$17,000
- - $33,470 6,562 - - - - - - -
-
kWh
$33,470
6,562
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,725
Cost:
$28,875
$8,725 260,440 - - - - - - - - $8,725
260,440
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$325,890
Cost:
$295,000
- - $325,890 63,900 - - - - - - -
-
kWh
$325,890
63,900
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$51,100
Cost:
$95,000
- - - - $51,100 340,000 - - - - -
-
kWh
-
-
MMBtu
$51,100
340,000
lb
-
-
$
-
-
$
07: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$1,754
Cost:
-
- - - - $2 136 $57 - $1,695 - -
-
kWh
-
-
MMBtu
$2
136
lb
$57
-
$
$1,695
-
$
TOTAL RECOMMENDED Savings:
$430,529
Cost:
$435,875
$15,935 475,690 $361,740 71,105 $51,102 340,136 $57 - $1,695 - $15,935
475,690
kWh
$361,740
71,105
MMBtu
$51,102
340,136
lb
$57
-
$
$1,695
-
$
TOTAL IMPLEMENTED Savings:
$12,859
Cost:
$28,875
$8,725 260,440 $2,380 643 $2 136 $57 - $1,695 - $8,725
260,440
kWh
$2,380
643
MMBtu
$2
136
lb
$57
-
$
$1,695
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material