IAC Assessment: GT0716
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0716
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Oriented Strand Board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $50,000,000-$100,000,000
# of Employees 147
Plant Area (Sq.Ft.) 305,000
Annual Production 313,000 Thousand Feet
Production Hrs. Annual 7,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,216,650 58,492,800 kWh $0.02
Electricity Demand $1,029,598 86,231 kW-months/year $11.94
Electricity Fees $100,661 - $ -
Natural Gas $2,346,910 505,582 MMBtu $4.64
TOTAL ENERGY COSTS $4,715,869
RECOMMENDED SAVINGS* $849,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ Tgal
01: 2.5194 REDESIGN PROCESS Savings:
$807,905
Cost:
$500,000
- - - - - - $727,905 136,800 - - $80,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$727,905
136,800
MMBtu
-
-
gal
$80,000
-
$
-
-
Tgal
02: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$12,800
Cost:
-
- - - - - - - - - - - - $12,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
$12,800
-
Tgal
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$201
Cost:
$450
$201 9,647 - - - - - - - - - - - - $201
9,647
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,000
Cost:
$2,000
$493 23,680 $458 38 $49 - - - - - - - - - $493
23,680
kWh
$458
38
kW-months/year
$49
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
05: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$9,825
Cost:
-
- - - - - - - - $9,825 3,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,825
3,000
gal
-
-
$
-
-
Tgal
06: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$18,150
Cost:
$5,900
- - - - - - - - $18,150 5,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$18,150
5,400
gal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$849,881
Cost:
$508,350
$694 33,327 $458 38 $49 - $727,905 136,800 $27,975 8,400 $80,000 - $12,800 - $694
33,327
kWh
$458
38
kW-months/year
$49
-
$
$727,905
136,800
MMBtu
$27,975
8,400
gal
$80,000
-
$
$12,800
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Water Consumption