IAC logo
IAC Assessment: GT0717
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0717
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Machined Components
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 210,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,912 10,604,693 kWh $0.02
Electricity Demand $250,227 23,020 kW-months/year $10.87
Electricity Fees $44,811 - $ -
Natural Gas $31,936 3,381 MMBtu $9.45
TOTAL ENERGY COSTS $546,791
RECOMMENDED SAVINGS* $71,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,160
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,765
Cost:
$16,300
$3,362 170,703 $4,403 405 - - - - - - - - - - $3,362
170,703
kWh
$4,403
405
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,700
Cost:
$10,500
$1,420 72,000 $1,280 118 - - - - - - - - - - $1,420
72,000
kWh
$1,280
118
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$17,390
Cost:
$4,510
- - - - $17,390 1,840 - - - - - - - - -
-
kWh
-
-
kW-months/year
$17,390
1,840
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,475
Cost:
$4,275
$15,720 798,000 $21,625 1,989 $(-33,870) (-3,584) - - - - - - - - $15,720
798,000
kWh
$21,625
1,989
kW-months/year
$(-33,870)
(-3,584)
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,600
Cost:
-
- - - - - - - - $18,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$18,600
-
$
-
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,465
Cost:
$67,250
$1,436 72,940 - - $6,029 638 - - - - - - - - $1,436
72,940
kWh
-
-
kW-months/year
$6,029
638
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$1,030
Cost:
$1,000
- - - - - - $2,355 15,996 - - $(-1,325) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,355
15,996
gal
-
-
$
$(-1,325)
-
$
-
-
$
08: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$6,000
Cost:
$25,180
- - - - - - $6,000 5,995 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,000
5,995
gal
-
-
$
-
-
$
-
-
$
09: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$7,200
Cost:
$29,314
- - - - - - - - $4,320 - - - $2,880 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$4,320
-
$
-
-
$
$2,880
-
$
TOTAL RECOMMENDED Savings:
$71,625
Cost:
$158,329
$21,938 1,113,643 $27,308 2,512 $(-10,451) (-1,106) $8,355 21,991 $22,920 - $(-1,325) - $2,880 - $21,938
1,113,643
kWh
$27,308
2,512
kW-months/year
$(-10,451)
(-1,106)
MMBtu
$8,355
21,991
gal
$22,920
-
$
$(-1,325)
-
$
$2,880
-
$
TOTAL IMPLEMENTED Savings:
$32,160
Cost:
$149,544
$6,218 315,643 $5,683 523 $6,029 638 $8,355 21,991 $4,320 - $(-1,325) - $2,880 - $6,218
315,643
kWh
$5,683
523
kW-months/year
$6,029
638
MMBtu
$8,355
21,991
gal
$4,320
-
$
$(-1,325)
-
$
$2,880
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Primary Product