Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Pork Meat Products
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $1,000,000-$5,000,000
# of Employees 24
Plant Area (Sq.Ft.) 21,280
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,295
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,358 709,440 kWh $0.01
Electricity Demand $23,579 1,604 kW-months/year $14.70
Electricity Fees $8,208 - $ -
Natural Gas $19,522 2,551 MMBtu $7.65
TOTAL ENERGY COSTS $69,641
RECOMMENDED SAVINGS* $107,496 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,881
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ Tgal $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$337
Cost:
$1,000
- - - - - - $337 44 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$337
44
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,475
Cost:
$600
$111 7,625 $1,279 87 $85 - - - - - - - - - - - $111
7,625
kWh
$1,279
87
kW-months/year
$85
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$467
Cost:
$943
- - - - - - $467 61 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$467
61
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,472
Cost:
$6,151
$227 15,547 $1,161 79 $84 - - - - - - - - - - - $227
15,547
kWh
$1,161
79
kW-months/year
$84
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$277
Cost:
$324
$43 2,974 $218 15 $16 - - - - - - - - - - - $43
2,974
kWh
$218
15
kW-months/year
$16
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$658
Cost:
$982
- - - - - - $658 86 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$658
86
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
07: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$1,320
Cost:
$50
- - - - - - $1,270 166 $30 69,000 - - $20 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,270
166
MMBtu
$30
69,000
Tgal
-
-
lb
$20
-
Tgal
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,740
Cost:
-
- - - - - - - - - - $7,740 180,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$7,740
180,000
lb
-
-
Tgal
-
-
$
09: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$93,750
Cost:
$1,700
- - - - - - - - - - - - - - $93,750 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
$93,750
-
$
TOTAL RECOMMENDED Savings:
$107,496
Cost:
$11,750
$381 26,146 $2,658 181 $185 - $2,732 357 $30 69,000 $7,740 180,000 $20 - $93,750 - $381
26,146
kWh
$2,658
181
kW-months/year
$185
-
$
$2,732
357
MMBtu
$30
69,000
Tgal
$7,740
180,000
lb
$20
-
Tgal
$93,750
-
$
TOTAL IMPLEMENTED Savings:
$4,881
Cost:
$8,125
$381 26,146 $2,658 181 $185 - $1,607 210 $30 69,000 - - $20 - - - $381
26,146
kWh
$2,658
181
kW-months/year
$185
-
$
$1,607
210
MMBtu
$30
69,000
Tgal
-
-
lb
$20
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption Primary Product