IAC logo
IAC Assessment: GT0724
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0724
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Afaghans & Tapestry Products
NAICS n/a
SIC 2392 - Housefurnishings, Nec
Sales $50,000,000-$100,000,000
# of Employees 217
Plant Area (Sq.Ft.) 220,000
Annual Production 2,125,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,743 5,413,960 kWh $0.03
Electricity Demand $114,194 1,226 kW-months/year $93.14
Electricity Fees $28,549 - $ -
Natural Gas $103,026 12,451 MMBtu $8.27
TOTAL ENERGY COSTS $398,284
RECOMMENDED SAVINGS* $70,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,067
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,810
Cost:
$8,370
$3,281 113,004 $1,389 13 $140 - - - - - $3,281
113,004
kWh
$1,389
13
kW-months/year
$140
-
$
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,554
Cost:
-
$1,737 59,844 $743 7 $74 - - - - - $1,737
59,844
kWh
$743
7
kW-months/year
$74
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,832
Cost:
$1,800
$4,641 159,840 $1,992 19 $199 - - - - - $4,641
159,840
kWh
$1,992
19
kW-months/year
$199
-
$
-
-
MMBtu
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,279
Cost:
$5,900
$4,154 143,087 - - $125 - - - - - $4,154
143,087
kWh
-
-
kW-months/year
$125
-
$
-
-
MMBtu
-
-
$
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$6,956
Cost:
$7,500
$5,390 185,637 $1,364 38 $202 - - - - - $5,390
185,637
kWh
$1,364
38
kW-months/year
$202
-
$
-
-
MMBtu
-
-
$
06: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$45,009
Cost:
$3,850
- - - - - - $15,009 1,814 $30,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$15,009
1,814
MMBtu
$30,000
-
$
TOTAL RECOMMENDED Savings:
$70,440
Cost:
$27,420
$19,203 661,412 $5,488 77 $740 - $15,009 1,814 $30,000 - $19,203
661,412
kWh
$5,488
77
kW-months/year
$740
-
$
$15,009
1,814
MMBtu
$30,000
-
$
TOTAL IMPLEMENTED Savings:
$18,067
Cost:
$15,200
$14,185 488,564 $3,356 57 $526 - - - - - $14,185
488,564
kWh
$3,356
57
kW-months/year
$526
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes