IAC logo
IAC Assessment: GT0733
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0733
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2002
Principal Product yellow pine lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 400,000
Annual Production 64,000,000 Thousand Feet
Production Hrs. Annual 2,340
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $312,076 6,056,388 kWh $0.05
Natural Gas $671 61 MMBtu $11.00
Wood $88,266 250,720 MMBtu $0.35
TOTAL ENERGY COSTS $468,131
RECOMMENDED SAVINGS* $2,196,973 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Wood Water Disposal Administrative Changes Primary Product Electricity Usage Wood Water Disposal Administrative Changes Primary Product
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$13,100
Cost:
$1,000
- - - - - - $13,100 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$13,100
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,343
Cost:
$49,000
$45,343 824,443 - - - - - - - - $45,343
824,443
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION Savings:
$56,762
Cost:
$237,300
$56,762 293,083 - - - - - - - - $56,762
293,083
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$22,495
Cost:
$2,500
- - $22,495 30,139 - - - - - - -
-
kWh
$22,495
30,139
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,965
Cost:
$14,670
$6,965 139,215 - - - - - - - - $6,965
139,215
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$51,992
Cost:
$57,500
$1,918 34,584 - - $50,074 34,633,000 - - - - $1,918
34,584
kWh
-
-
MMBtu
$50,074
34,633,000
Tgal
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$316
Cost:
$1,132
- - $316 904 - - - - - - -
-
kWh
$316
904
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 4.446 AUTOMATE FINISHING PROCESS Savings:
$2,000,000
Cost:
$200,000
- - - - - - - - $2,000,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$2,000,000
-
$
TOTAL RECOMMENDED Savings:
$2,196,973
Cost:
$563,102
$110,988 1,291,325 $22,811 31,043 $50,074 34,633,000 $13,100 - $2,000,000 - $110,988
1,291,325
kWh
$22,811
31,043
MMBtu
$50,074
34,633,000
Tgal
$13,100
-
$
$2,000,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $