IAC Assessment: GT0736
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0736
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2002
Principal Product Processed Meat
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 1,278
Plant Area (Sq.Ft.) 288,000
Annual Production 352,283,985 Pounds
Production Hrs. Annual 5,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,471,059 30,196,073 kWh $0.05
Natural Gas $640,580 137,264 MMBtu $4.67
Fuel Oil #2 $123,150 16,601 MMBtu $7.42
TOTAL ENERGY COSTS $2,234,789
RECOMMENDED SAVINGS* $167,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,966
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Water Consumption
$ kWh $ MMBtu $ MMBtu $ $ $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,485
Cost:
-
$1,388 46,307 - - - - $97 - - - $1,388
46,307
kWh
-
-
MMBtu
-
-
MMBtu
$97
-
$
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$384
Cost:
$500
$359 11,723 - - - - $25 - - - $359
11,723
kWh
-
-
MMBtu
-
-
MMBtu
$25
-
$
-
-
Tgal
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$33,702
Cost:
$5,000
- - - - - - - - $33,702 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$33,702
-
Tgal
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$38,000
Cost:
$38,000
- - - - $38,000 13,394 - - - - -
-
kWh
-
-
MMBtu
$38,000
13,394
MMBtu
-
-
$
-
-
Tgal
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,344
Cost:
-
- - - - - - $14,344 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$14,344
-
$
-
-
Tgal
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$8,300
Cost:
-
- - - - - - $8,300 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$8,300
-
$
-
-
Tgal
07: 2.2514 COVER OPEN TANKS Savings:
$3,121
Cost:
$6,000
- - $3,121 661 - - - - - - -
-
kWh
$3,121
661
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$44,595
Cost:
$27,000
- - $44,595 9,446 - - - - - - -
-
kWh
$44,595
9,446
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
09: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$8,580
Cost:
-
- - $8,580 2,136 - - - - - - -
-
kWh
$8,580
2,136
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,745
Cost:
$31,000
$13,780 444,607 - - - - $965 - - - $13,780
444,607
kWh
-
-
MMBtu
-
-
MMBtu
$965
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$167,256
Cost:
$107,500
$15,527 502,637 $56,296 12,243 $38,000 13,394 $23,731 - $33,702 - $15,527
502,637
kWh
$56,296
12,243
MMBtu
$38,000
13,394
MMBtu
$23,731
-
$
$33,702
-
Tgal
TOTAL IMPLEMENTED Savings:
$50,966
Cost:
$5,500
$359 11,723 $8,580 2,136 - - $8,325 - $33,702 - $359
11,723
kWh
$8,580
2,136
MMBtu
-
-
MMBtu
$8,325
-
$
$33,702
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ Tgal
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Water Consumption