Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2002 |
Principal Product | Kaolin |
NAICS | n/a |
SIC | 3295 - Minerals, Ground Or Treated |
Sales | $10,000,000-$50,000,000 |
# of Employees | 460 |
Plant Area (Sq.Ft.) | 145,000 |
Annual Production | 2,147,483,647 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,309,623 | 56,955,634 | kWh | $0.04 |
Natural Gas | $3,663,100 | 1,046,000 | MMBtu | $3.50 |
Fuel Oil #2 | $3,327 | 679 | MMBtu | $4.90 |
TOTAL ENERGY COSTS | $5,976,050 | |||
RECOMMENDED SAVINGS* | $1,309,514 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $114,954 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Increase in Production | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $80,749 Cost: - |
- | - | $80,749 | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$80,749 - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $204 Cost: - |
$204 | 5,392 | - | - | - | - | - | - | - | - | - | - | - | - |
$204 5,392 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,490 Cost: $2,100 |
$3,490 | 91,652 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,490 91,652 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $9,470 Cost: - |
$9,470 | 250,200 | - | - | - | - | - | - | - | - | - | - | - | - |
$9,470 250,200 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $16,970 Cost: $15,430 |
$16,970 | 448,331 | - | - | - | - | - | - | - | - | - | - | - | - |
$16,970 448,331 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $268,450 Cost: $200,000 |
- | - | - | - | $268,450 | 76,700 | - | - | - | - | - | - | - | - |
- - kWh |
- - $ |
$268,450 76,700 MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $674,846 Cost: $2,070,000 |
$1,459,000 | 38,556,000 | - | - | $(-591,374) | (-168,964) | - | - | $(-192,780) | - | - | - | - | - |
$1,459,000 38,556,000 kWh |
- - $ |
$(-591,374) (-168,964) MMBtu |
- - lb |
$(-192,780) - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $13,635 Cost: $98,936 |
$13,635 | 360,200 | - | - | - | - | - | - | - | - | - | - | - | - |
$13,635 360,200 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $14,600 Cost: - |
- | - | - | - | - | - | - | - | - | - | $14,600 | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
$14,600 - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $3,600 Cost: $6,700 |
- | - | - | - | - | - | $3,600 | 240,000 | - | - | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
$3,600 240,000 lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $223,500 Cost: $100,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $223,500 | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
$223,500 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,309,514 Cost: $2,493,166 |
$1,502,769 | 39,711,775 | $80,749 | - | $(-322,924) | (-92,264) | $3,600 | 240,000 | $(-192,780) | - | $14,600 | - | $223,500 | - | $1,502,769 39,711,775 kWh |
$80,749 - $ |
$(-322,924) (-92,264) MMBtu |
$3,600 240,000 lb |
$(-192,780) - $ |
$14,600 - Tgal |
$223,500 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $114,954 Cost: $121,066 |
$30,605 | 808,531 | $80,749 | - | - | - | $3,600 | 240,000 | - | - | - | - | - | - | $30,605 808,531 kWh |
$80,749 - $ |
- - MMBtu |
$3,600 240,000 lb |
- - $ |
- - Tgal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Increase in Production | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Increase in Production |