Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2002 |
Principal Product | Textile Finishing |
NAICS | n/a |
SIC | 2269 - Finishing Plants, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 528,700 |
Annual Production | 13,500,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $174,809 | 6,943,142 | kWh | $0.03 |
Electricity Demand | $163,188 | 19,441 | kW-months/year | $8.39 |
Natural Gas | $271,125 | 48,705 | MMBtu | $5.57 |
TOTAL ENERGY COSTS | $630,842 | |||
RECOMMENDED SAVINGS* | $103,406 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $1,259 Cost: - |
- | - | - | - | $1,259 | 226 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,259 226 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $5,598 Cost: - |
- | - | - | - | $5,598 | 1,005 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,598 1,005 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $671 Cost: - |
$671 | 39,566 | - | - | - | - | - | - | - | - |
$671 39,566 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER |
Savings: $10,781 Cost: $1,720 |
- | - | - | - | $7,276 | 1,306 | - | - | $3,505 | - |
- - kWh |
- - kW-months/year |
$7,276 1,306 MMBtu |
- - $ |
$3,505 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $78,433 Cost: $112,650 |
$16,651 | 979,484 | $48,248 | 502 | - | - | $4,380 | - | $9,154 | - |
$16,651 979,484 kWh |
$48,248 502 kW-months/year |
- - MMBtu |
$4,380 - $ |
$9,154 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,792 Cost: $5,050 |
$(-77) | (-4,396) | - | - | $2,869 | 515 | - | - | - | - |
$(-77) (-4,396) kWh |
- - kW-months/year |
$2,869 515 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,206 Cost: $17,240 |
$1,257 | 73,857 | $949 | 10 | - | - | - | - | - | - |
$1,257 73,857 kWh |
$949 10 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,666 Cost: - |
$949 | 55,686 | $717 | 7 | - | - | - | - | - | - |
$949 55,686 kWh |
$717 7 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $103,406 Cost: $136,660 |
$19,451 | 1,144,197 | $49,914 | 519 | $17,002 | 3,052 | $4,380 | - | $12,659 | - | $19,451 1,144,197 kWh |
$49,914 519 kW-months/year |
$17,002 3,052 MMBtu |
$4,380 - $ |
$12,659 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,040 Cost: $1,720 |
- | - | - | - | $8,535 | 1,532 | - | - | $3,505 | - | - - kWh |
- - kW-months/year |
$8,535 1,532 MMBtu |
- - $ |
$3,505 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Water Consumption |