Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2003 |
Principal Product | PRESSURE GAUGES |
NAICS | 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3823 - Process Control Instruments |
Sales | $50,000,000-$100,000,000 |
# of Employees | 466 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 7,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $291,926 | 5,713,181 | kWh | $0.05 |
Natural Gas | $43,881 | 3,536 | MMBtu | $12.41 |
TOTAL ENERGY COSTS | $335,807 | |||
RECOMMENDED SAVINGS* | $93,870 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,222 |
#|Description |
Savings Cost |
Status | Electricity Usage | Administrative Changes | Water Consumption | Electricity Usage | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,646 Cost: $264 |
$1,646 | 56,784 | - | - | - | - |
$1,646 56,784 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8112 COMBINE UTILITY METERS |
Savings: $996 Cost: - |
- | - | $996 | - | - | - |
- - kWh |
$996 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,387 Cost: $5,000 |
$1,387 | 80,496 | - | - | - | - |
$1,387 80,496 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,711 Cost: - |
$1,711 | 59,030 | - | - | - | - |
$1,711 59,030 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,124 Cost: $12,499 |
$6,124 | 193,974 | - | - | - | - |
$6,124 193,974 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $8,513 Cost: $350 |
$8,513 | 229,600 | - | - | - | - |
$8,513 229,600 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,644 Cost: $10,000 |
$7,644 | 263,603 | - | - | - | - |
$7,644 263,603 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE |
Savings: $22,273 Cost: $8,000 |
$22,273 | 618,700 | - | - | - | - |
$22,273 618,700 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $43,576 Cost: $51,000 |
- | - | - | - | $43,576 | - |
- - kWh |
- - $ |
$43,576 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $93,870 Cost: $87,113 |
$49,298 | 1,502,187 | $996 | - | $43,576 | - | $49,298 1,502,187 kWh |
$996 - $ |
$43,576 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,222 Cost: $17,499 |
$9,222 | 333,500 | - | - | - | - | $9,222 333,500 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Administrative Changes | Water Consumption | Electricity Usage | Administrative Changes | Water Consumption |