IAC Assessment: GT0768
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0768
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2003
Principal Product VANE PUMPS
NAICS 333996 - Fluid Power Pump and Motor Manufacturing
SIC 3594 - Fluid Power Pumps And Motors
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 134,000
Annual Production 150,000 Pieces
Production Hrs. Annual 6,240
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $284,707 12,050,760 kWh $0.02
Electricity Demand $234,876 24,180 kW-months/year $9.71
Natural Gas $154,739 26,842 MMBtu $5.76
TOTAL ENERGY COSTS $683,632
RECOMMENDED SAVINGS* $117,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Administrative Changes Water Consumption
$ kWh $ kW-months/year $ $ $ $ $ Tgal
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,075
Cost:
$15,000
$10,075 224,726 - - - - - - - - $10,075
224,726
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,376
Cost:
-
- - $2,040 240 - - $336 - - - -
-
kWh
$2,040
240
kW-months/year
-
-
$
$336
-
$
-
-
Tgal
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$42,648
Cost:
-
- - $35,700 4,200 $6,948 - - - - - -
-
kWh
$35,700
4,200
kW-months/year
$6,948
-
$
-
-
$
-
-
Tgal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$13,900
Cost:
$2,400
$13,900 539,649 - - - - - - - - $13,900
539,649
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
05: 2.8112 COMBINE UTILITY METERS Savings:
$16,340
Cost:
-
- - - - $16,340 - - - - - -
-
kWh
-
-
kW-months/year
$16,340
-
$
-
-
$
-
-
Tgal
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,160
Cost:
-
- - $16,816 4,152 $344 - - - - - -
-
kWh
$16,816
4,152
kW-months/year
$344
-
$
-
-
$
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$14,590
Cost:
$4,725
- - - - - - - - $14,590 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$14,590
-
Tgal
TOTAL RECOMMENDED Savings:
$117,089
Cost:
$22,125
$23,975 764,375 $54,556 8,592 $23,632 - $336 - $14,590 - $23,975
764,375
kWh
$54,556
8,592
kW-months/year
$23,632
-
$
$336
-
$
$14,590
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Administrative Changes Water Consumption