IAC logo
IAC Assessment: GT0783
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0783
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product CDS/DVDS
NAICS 334614 - Software and Other Prerecorded Compact Disc, Tape, and Record Reproducing
SIC 3652 - Prerecorded Records And Tapes
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 180,000
Annual Production 45,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $398,589 18,754,461 kWh $0.02
Electricity Demand $472,279 26,115 kW-months/year $18.08
Natural Gas $188,159 20,391 MMBtu $9.23
TOTAL ENERGY COSTS $1,059,027
RECOMMENDED SAVINGS* $144,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $108,787
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,670
Cost:
$3,000
$894 34,048 $6,776 538 - - - - $894
34,048
kWh
$6,776
538
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,870
Cost:
$1,250
$1,870 66,350 - - - - - - $1,870
66,350
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$28,110
Cost:
$3,700
$28,110 999,000 - - - - - - $28,110
999,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$35,410
Cost:
-
$5,910 210,000 - - $29,500 4,770 - - $5,910
210,000
kWh
-
-
kW-months/year
$29,500
4,770
MMBtu
-
-
$
05: 3.4155 METER WASTE WATER Savings:
$33,200
Cost:
$2,000
- - - - - - $33,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$33,200
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,190
Cost:
$1,020
$1,664 96,360 $2,526 132 - - - - $1,664
96,360
kWh
$2,526
132
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,242
Cost:
$20,982
$9,284 354,139 $6,958 552 - - - - $9,284
354,139
kWh
$6,958
552
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,875
Cost:
$655
$7,581 289,174 $5,294 420 - - - - $7,581
289,174
kWh
$5,294
420
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,000
Cost:
$1,500
$5,000 177,625 - - - - - - $5,000
177,625
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$144,567
Cost:
$34,107
$60,313 2,226,696 $21,554 1,642 $29,500 4,770 $33,200 - $60,313
2,226,696
kWh
$21,554
1,642
kW-months/year
$29,500
4,770
MMBtu
$33,200
-
$
TOTAL IMPLEMENTED Savings:
$108,787
Cost:
$27,407
$31,309 1,193,648 $14,778 1,104 $29,500 4,770 $33,200 - $31,309
1,193,648
kWh
$14,778
1,104
kW-months/year
$29,500
4,770
MMBtu
$33,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes