Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2004 |
Principal Product | CDS/DVDS |
NAICS | 334614 - Software and Other Prerecorded Compact Disc, Tape, and Record Reproducing |
SIC | 3652 - Prerecorded Records And Tapes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 45,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $398,589 | 18,754,461 | kWh | $0.02 |
Electricity Demand | $472,279 | 26,115 | kW-months/year | $18.08 |
Natural Gas | $188,159 | 20,391 | MMBtu | $9.23 |
TOTAL ENERGY COSTS | $1,059,027 | |||
RECOMMENDED SAVINGS* | $144,567 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $108,787 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $7,670 Cost: $3,000 |
$894 | 34,048 | $6,776 | 538 | - | - | - | - |
$894 34,048 kWh |
$6,776 538 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,870 Cost: $1,250 |
$1,870 | 66,350 | - | - | - | - | - | - |
$1,870 66,350 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $28,110 Cost: $3,700 |
$28,110 | 999,000 | - | - | - | - | - | - |
$28,110 999,000 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $35,410 Cost: - |
$5,910 | 210,000 | - | - | $29,500 | 4,770 | - | - |
$5,910 210,000 kWh |
- - kW-months/year |
$29,500 4,770 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4155 METER WASTE WATER |
Savings: $33,200 Cost: $2,000 |
- | - | - | - | - | - | $33,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$33,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $4,190 Cost: $1,020 |
$1,664 | 96,360 | $2,526 | 132 | - | - | - | - |
$1,664 96,360 kWh |
$2,526 132 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,242 Cost: $20,982 |
$9,284 | 354,139 | $6,958 | 552 | - | - | - | - |
$9,284 354,139 kWh |
$6,958 552 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $12,875 Cost: $655 |
$7,581 | 289,174 | $5,294 | 420 | - | - | - | - |
$7,581 289,174 kWh |
$5,294 420 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,000 Cost: $1,500 |
$5,000 | 177,625 | - | - | - | - | - | - |
$5,000 177,625 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $144,567 Cost: $34,107 |
$60,313 | 2,226,696 | $21,554 | 1,642 | $29,500 | 4,770 | $33,200 | - | $60,313 2,226,696 kWh |
$21,554 1,642 kW-months/year |
$29,500 4,770 MMBtu |
$33,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $108,787 Cost: $27,407 |
$31,309 | 1,193,648 | $14,778 | 1,104 | $29,500 | 4,770 | $33,200 | - | $31,309 1,193,648 kWh |
$14,778 1,104 kW-months/year |
$29,500 4,770 MMBtu |
$33,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||